Original source · versioned page text
Approved Plan OPW22/0100
NOOSA COUNCIL
APPROVED PLAN
OPW22/0100 15 JULY 2022
BIO-RETENTION
BASIN
THIS BIO-RETENTION BASIN REDUCES
THE POLLUTION OF OUR WATERWAYS
BY REDUCING THE AMOUNT OF HEAVY
METALS, LITTER, SUSPENDED SOLIDS
AND NUTRIENTS DISCHARGED INTO
OUR WATERWAYS.
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — At
NOOSA COUNCIL
APPROVED PLAN
OPW22/0100 15 JULY 2022
FINISHED LEVEL
AS PER PLAN.
|
GATE/LID (HOT DIP GALV
-—— WHERE STEEL) TO
ENGINEER'S APPROVAL.
OCEANGUARD PIT INSTALLED AND
;——— MAINTAINED TO MANUFACTURERS
SPECIFICATIONS.
———-]L
R12 GALV DOWELS @ 400 7
FINISHED LEVEL 400(L) EPOXY GROUTED
AS PER PLAN.
GATE/UID (HOT DIP GALV
100mm MIN INTO PIT. PT ==CEET | |
WHERE STEEL) TO
/ ENGINEER'S APPROVAL.
OVERALL
DEPTH
R10 GALV DOWELS @ 400
400(L) EPOXY GROUTED
100mm MIN INTO PIT.
TELLAM PRE-CAST ——=
IL. AS NOTED
ON PLAN.
CLEARANCE
SEE DESIGN TABLE
PIPE TO
OUTLET
- -”»
Bl:
BAG DEPTH
SEE DESIGN TABLE
PIT OR EQUIV.
THKNESS AS AS NOTED
PER MANU. _ |_| | _ON PLAN
\ IL’s AS NOTED
PRE-CAST STORMWATER PIT SECTION
ON PLAN.
VEHICLE GUARD RAIL IN
ACCORDANCE WITH AS2890.
MINIMUM HT OF
BLOCKWALLS (NON WEIR)
180 DIAM. ORIFICE TO
SIDE OF INLET PIT FIT
WITH MESH BASKET
900 SQ GRATED SW INLET
PIT WITH RAISED DOME
BLOCK RETAINING WALL
SURROUNDING DETENTION
BASIN/BIO-BED WEIR WALL
SURROUND GRATE, SET TOP OF PIT
_ A Se i Timm ABOVE FINISHED = HT —e
\ BIO-RETENTION FILTER MEDIA & SURFACE IN BED | |
BATTERS TO BE PLANTED IN , RL11.30 EMERGENCY
ACCORDANCE WITH AUSTRALIAN vy |_| __EMERGEN
STANDARDS, Q100 LEVEL RL11.14m t OVERFLOW WER
|Z
PROVIDE TURFING OUTSIDE | 3
BLOCK RETAINING WALL BIO-RETENTION FILTER AREA. =
SURROUNDING DETENTION 300. |
BASIN/BIO-BED 10s RL10.00
(Z) i r - EXISTING GROUND
FILTER MEDIA Ie a. ‘ OPE oe DIAM. "=" (APPROX. R.L. 10.25)
LAYER ~ 400mm i? of] °. | woo UPGRADE TO 300 DIAM 3
TRANSITION fo fe ‘ — . S
LAYER - 100mm — |
pRAINACE — HH OLALL EZ, LELN KLLIELLLLYLLLL ESL | | 300mm WIDE SCOUR
. 1 PROTECTION BETWEEN BLOCK
LAYER - 225mm GEOFAB FOS iNtaNy
2250 uPVC COLLECTOR |_| >
PIPE 0.5% GRADE MIN. i
100mm CLEAN COARSE
SAND TRANSITION
LAYER ABOVE
DRAINAGE LAYER
SLOTTED 100% uPVC PIPES 0.5%
GRADE MIN 750 CTRS SET IN
225 THICK 5-7mm CLEAN
GRAVEL DRAINAGE LAYER.
AS PER PLAN
LL. 9.23m)
/-—\ GPx WITH OCEANGUARD PIT INSERT
(7 MPICAL DETAIL
(HATCHED).
(RK BIO-RETENTION PIT DETAIL
\swi7 SECTION
GRADE STONE PITCHING FOR
EVEN FLOW INTO
BIO-RETENTION BED.
BLOCK RETAINING
WALL SURROUNDING
BIO-BED /DETENTION
BASIN
BIO-RETENTION BED
AS PER PLANS &
DETAILS.
AS NOTED.
BEDDING SAND.
RC CONCRETE HEAD WALL
WITH STONE PITCHING
SCOUR PROTECTION FOR
EVEN FLOWS INTO
BIO-RETENTION BED.
SW FLOW DISPERTION — RC _HEADWALL
DRAINAGE PIPE SIZES ——
APPROVED COMPACTED
DRIVEWAY PAVEMENT. REFER
DRIVEWAY & ACCESS PLAN
[ FOR REINFORCING.
st
a
———_]
300mm MIN THK COMPACTED
GRANULAR MATERIAL UNDER SLAB.
TRAFFICABLE AREAS
MIN 98% FIELD DENSITY THROUGH
BACKFILL DEPTH. D>900mm
NON-TRAFFICALBE AREAS
COMPACT IN 150mm LAYERS D>400mm
/-- SW PIPE TRENCH/PIPE BEDDING & BACKFILLING
\ / UNDER PAVEMENT TYPICAL SECTION
TIMBER PALING FENCE
TERRACE SLAB PROVIDE SLEEPER ALONG
BASE OF PALING FENCE TO
AS PER PLANS
se [Reva FLOWS WITHIN
re Mh: SWALE
i
| 1000mm MIN
i
SWALE DRAIN,
REFER DETAIL
/B\ REAR DRAINAGE SWALE
\CSWATYPICAL SECTION
THIS PLAN TO BE READ IN CONJUNCTION WITH
SCG CONSULTING ENGINEERS STORMWATER
MANAGEMENT REPORT 31131(SWM)
LOOSE STONE PITCHING WITHIN
SWALE OVER GEOTEXTILE BLANKET
TYPICAL SECTION VEGETATED SWALE
FALL, WW
—_ GP1 a
100 DIAM uPVC CONNECTOR
a _ PPS
TRUNK DRAIN AS INDICATED
_ — ON PLAN
GALVANISED KERB ADAPTOR TO LOCAL
AUTHORITY STANDARDS AND IPWEA
STD. DRG SEQ-RS-081. CUT OUT
LAYBACK KERB AS NECESSARY TO
INSTALL GALVANISED KERB ADAPTOR
WITH NEAT, TIGHT FIT.
INSTALL REECE 'RHS TO PVC
ADAPTOR’ (PROD. CODE 304284),
OR APPROVED EQUIVELANT AS PER
MANUFACTURERS SPECIFICATIONS.
2/125x75. x4.0 RHS
H.D. GALV. PIPES ACROSS
FOOTPATH/VERGE.
SECTION DETAIL
/—— REAR OF UNIT DRAINAGE PIT
\.=/ TYPICAL SECTION
LAY BACK KERB ADAPTOR TO
EXISTING KERB DETAIL (RHS).
PROVIDE ABOVE SIGN IN BIO-BASIN
KERB OUTLET (2)
B Revisions for Council RFI
01.06.22
A Revisions for Council RFI
49.05.22
Revision
Description
Date
Iss
* FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
DEBUILD T/A
C) S06
ABN 40 098 481 899
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
Title:
STORMWATER DETAILS
Project
89-93 Eumundi Noosa Rd,
NOOSAVILLE
Date: Apri 22 Drawn SR Design SR
re 3131-SW1.2 |B.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Approved Plan OPW22_0100.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.