Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

TPC 1350 - Change to Development Approval [As Published]

of 22

Page text read automatically using OCR, there may be inaccuracies

 

 

Sunshine Coast Checklist - Applications Involving Land

Regional Council

Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1.

APPLICATION FORMS
1.1 Form1 PartA

1.1.1. Ensure that the form is fully completed and is a current version.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1. If there are multiple owners, the consent of each owner is required.

1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated b

signatory) or Company Seal required.
1.2 Form4 Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
4.1.2.1 Ensure that each of Forms B-R which are attached are fully completed.

IDAS ASSESSMENT CHECKLIST we
2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals

2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)

‘ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G:is completed if EPA referral is required.

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)

FORM 2 - REQUEST TO CHANGE APPROVAL

4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.

If over multiple properties on one or more sites, consent of Body Corporate is required.

PLANS

5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete.

§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.

SUPPORTING INFORMATION

6.1. Ensure that generally at feast 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping

FEE

7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

<

 

 

 

 

L
L

Lit

HH

 

 

 

 

 

 

 

 

 

 

it

 

 

 

 

< He

 

 

 

 

 

 

v

 

 

 

Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational

Work if Jetty or if including Landscaping.
Land Development Lot Reconfiguration applications and Operational Work not including Landscaping

Please DO NOT leave the apptication at the counter and DO NOT deliver the application to Records.

 

NSC g:Manduse\administrative processes\application checklist.doc

 

Q

Log in to download the original (TPC 1350 - Change to Development Approval [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.