Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
Column 1 Column 2 Column 3
Including amendments to 3 July 2017
Type of development Categories of development and Assessment benchmarks for
The Noosa Plan
assessment assessable development 64
and requirements for accepted
development
Carrying out operational Code assessment If code assessment—
works associated with a) Landscaping Code; and
material change of use b) Engineering Works Codes
where Development
Permit for material
change of use has been
issued
Carrying out operational Code assessment If code assessment—
work associated with a) Landscaping Code; and
reconfiguring a lot b) Engineering Works Codes
where Development
Permit for reconfiguring
a lot has been issued
Carrying out operational Accepted development subject to If accepted development subject to
work for the requirements requirements—
construction of a Column 2 of Table 14.48, Detached
driveway for a Code assessment if not House Driveways Code
Detached house or complying with column 2 of Table
Community 14.48 of the Detached House If code assessment —
residence69 Driveways Code Detached House Driveways Code.
Excavation or filling of Accepted development subject to If accepted development subject to
land not associated with requirements 7071 if— requirements—
a material change of a) Column 2 of Table 14-52,
use (not for the purpose a) in either the Detached Earthworks Code; and
of constructing a dam) Housing Zone or the Semi- b) Column 2 of Table 14-53 of the
Attached Housing Zone and Erosion and Sediment Control
involving less than 10m 3 of Code
material; or
b) in all other zones and
involving less than 100m 3 of
material.
If code assessment —
Code assessment if— a) Earthworks Code; and
a) not complying with column 2 b) Erosion and Sediment Control
of Table 14-52 of the Code.
Earthworks Code; or
b) in either the Detached
Housing Zone or the Semi-
Attached Housing Zone and
involving10m3 or more of
material; or
c) in all other zones and
involving 100m3 or more of
material.
69
A separate operational works approval is not required where the construction of a driveway for a detached house or
community residence is associated with a material change of use.
70
This applies only once to any premises
66-67
This applies only once to any premises.
6-33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.