2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
Editor’s note—A development permit approval is not required for development that is accepted
development. Under section 44(6)(a) of the Planning Act 2016, if a categorising instrument does not
Including amendments to 3 July 2017
apply a category of development to a particular development, the development is accepted
The Noosa Plan
development. Schedule 7 of the Planning Regulation 2017 also prescribes accepted development.
ii assessable development;
a. code assessment
b. impact assessment
Editor’s note—A development approval is required for assessable development. Schedules 9, 10
and 12 of the Planning Regulation 2017 also prescribe assessable development.
iii prohibited development
Editor’s note—A development application may not be made for prohibited development. Schedule 10 of
the Planning Regulation 2017 prescribes prohibited development.
b) The planning scheme states the category of development for certain types of
development, and specifies the category of assessment for assessable development in
the planning scheme area in:
i. Tables 4.1 to 4.9—Boreen Point, Kin Kin & Cootharaba Locality;
ii. Tables 5.1 to 5.6—Cooroibah Locality;
iii. Tables 6.1 to 6.11—Cooroy & Lake Macdonald Locality;
iv. Tables 7.1 to 7.10 —Eastern Beaches Locality;
v. Tables 8.1 to 8.10—Mary River Catchment Locality;
vi. Tables 9.1 to 9.10—Noosa Heads Locality;
vii. Tables 10.1 to 10.7—Noosa North Shore Locality;
viii. Tables 11.1 to 11.12—Noosaville Locality;
ix. Tables 12.1 to 12.11—Tewantin & Doonan Locality;
x. Table 13.1—Biodiversity Overlay;
xi. Tables 13.3 to 13.4—Heritage Overlay; and
xii. Tables 13.6 to 13.7—Natural Hazards and Natural Resources Overlays.
Editor’s note—Section 43 of the Planning Act 2016 identifies that a categorising instrument categorises
development and specifies categories of assessment and may be a regulation or local categorising
instrument. A local categorising instrument includes a planning scheme, a TLPI or a variation approval.
2.5.2 Hierarchy of assessment benchmarks
Where there is inconsistency between provisions in the planning scheme, the following rules
apply:
a) the strategic framework and desired environmental outcomes prevail over all other
components to the extent of the inconsistency for impact assessment;
b) relevant codes as specified in schedules 6 and 10 of the Regulation prevail over all
other components to the extent of the inconsistency;
c) overlays prevail over all other components (other than the matters mentioned in (a)
and (b) to the extent of the inconsistency;
2-3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.