2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
ii. if an overlay applies to the premises, by reference to the overlay maps in Parts
4-12;
Including amendments to 3 July 2017
The Noosa Plan
c) determine if the development is accepted development under schedules 6 of the
Regulation;
Editor’s note- Schedule 6 of the Regulation prescribes development that a planning scheme cannot
state is assessable development where the matters identified in the schedule are met.
d) determine if the development is assessable development under schedule 10 of the
Regulation;
e) if the development is not listed in the tables under schedule 6 of the Regulation
determine the initial category of development and assessment by reference to the
tables in:
i. Parts 4-12 Categories of development and assessment—Material change of
use;
ii. Parts 4-12 Categories of development and assessment—Other than a
material change of use (reconfiguring a lot, building works and operational
works);
f) if a precinct of a zone changes the category of development or assessment this will
be shown in the ‘category of development and assessment’ column of the tables in
Parts 4-12 relating to categories of development and assessment for material
change of use, reconfiguring a lot, building work and operational works;
g) if an overlay applies refer to Category of development and assessment Part 13-
Overlays to determine if the overlay further changes the category of development
or assessment.
2.6.3 Determining the category of development and categories of assessment
a) A material change of use is assessable development requiring impact assessment:
i. unless the table of assessment states otherwise;
ii. if a use is not listed or defined;
iii. unless otherwise prescribed in the Act or the Regulation.
b) Reconfiguring a lot is assessable development requiring code assessment unless
the tables of assessment state otherwise or unless otherwise prescribed in the Act or
the Regulation.
c) Building work and operational work are accepted development, unless the tables of
assessment state otherwise or unless otherwise prescribed in the Act or the
Regulation.
d) Where an aspect of development is proposed on premises included in more than
one zone, locality plan or overlay, the category of development or assessment for
that aspect is the highest category under each of the applicable zones, locality plan
or overlay.
e) Where development is proposed on premises partly affected by an overlay, the
category of development or assessment for the overlay only relates to the part of the
premises affected by the overlay.
f) If development is identified as having a different category of development or
category of assessment under a zone than an overlay the highest category of
development or assessment applies as follows:
2-5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.