Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
Column 1 Column 2 Column 3
Including amendments to 3 July 2017
Type of development Categories of development and Assessment benchmarks for
The Noosa Plan
assessment assessable development57
and requirements for accepted
development
Excavation or filling of Accepted development subject to If accepted development subject to
land not associated with requirements6364 if— requirements—
a material change of a) Column 2 of Table 14-52 of the
use (not for the purpose a) in either the Detached Earthworks Code; and
of constructing a dam) Housing Zone or the Semi- b) Column 2 of Table 14-53 of the
Attached Housing Zone and Erosion and Sediment Control
involving less than 10m3 of Code
material; or
b) in all other zones and If code assessment —
involving less than 100m 3 of a) Earthworks Code; and
material. b) Erosion and Sediment Control
Code.
Code assessment if—
a) not complying with column 2
of Table 14-52 of the
Earthworks Code; or
b) in either the Detached
Housing Zone or Semi-
Attached Housing Zone and
involving 10m3 or more of
material; or
c) in all other zones and
involving 100m3 or more of
material.
Excavation or filling not Accepted development subject to If accepted development subject to
associated with a requirements65 64 if— requirements—
material change of use a) Column 2 of Table 14-52 of
for the purpose of a) Rural Settlement Zone and the Earthworks Code; and
constructing a dam involving less than 500m 3 of b) Column 2 of Table 14-53 of
material; or the Erosion and Sediment
b) Rural Zone where the lot is Control Code
5ha or greater; or
c) Rural Zone where the lot is If code assessment —
less than 5ha and involving a) Earthworks Code; and
less than 500m3 of material. b) Erosion and Sediment Control
Code.
Code assessment if—
a) not complying with column 2
of Table 14-52 of the
Earthworks Code; or
b) Rural Settlement Zone and
involving 500m3 or more of
material; or
c) Rural Zone where the lot is
less than 5ha and involving
500m3 or more of material;
or
d) in all other zones.
61-62
This applies only once to each premises.
64
This applies only once to each premises
8-27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.