Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
column 1 column 2
Specific Outcomes Probable solutions
Pedestrian and bike links
O100 Pedestrian and bicycle paths are constructed S100.1 Pedestrian and bicycle paths are
Including amendments to 3 July 2017
throughout the Shire Business Centre site, with constructed as shown on Schedule 4 - Shire
The Noosa Plan
appropriate external connections provided; Business Centre Map.
AND
O101 Pedestrian and bicycle movements between S101.1 No solution provided
key nodes within the Shire Business Centre site are
designated to minimise the need to cross over
roads and where road crossovers are necessary,
central refuges are provided.
Visual amenity and character
O102 Development— S102.1 From land to the south of the Shire
a) presents a high level of visual quality when Business Centre site at around RL10, the
viewed from Walter Hay Drive in the area of road reduces in level to a bridge deck of
Eenie Creek; RL4 or 5, providing visible sight lines across
b) provides an open space feel to this entry to the Shire Business Centre site.
Noosa; and
c) maintains the character of adjacent areas.
11.40 Development sequencing
First stage
O103 The first stage of development consists of— S103.1 For the first stage of development—
a) a shopping centre with a discount department a) a gross floor area equivalent to 20% of
store, and associated car parking within any Retail business Type 2 Shop
Business Precincts B1 and B2; gross floor area, is constructed for
b) a substantial amount of non-Retail business non-Retail business prior to such
development; Type 2 Shop development operating;
c) the construction of Eenie Creek Road and
between Reef Street and Langura Street; b) 40% of the gross floor area of non-
d) the construction of Walter Hay Drive between Retail business development is
Emu Mountain Road and Eenie Creek Road; contracted for sale or lease, prior to
e) interim transport circulation and access the Retail business Type 2 Shop
strategies in the absence of the internal loop development operating;
road76 being complete; AND
f) an established landscape theme for the S103.2 Two road accesses are constructed
developed precincts; into the Shire Business Centre site as part of
g) landscaped entry statements; the first stage of the development.
h) a suitable stormwater management system;
i) appropriate signage;
j) commencement of the associated pedestrian
and bikeway network and related external
connections; and
k) dedication of a substantial area of the
southern part of the Shire Business Centre as
public open space;
AND
O104 Subsequent development stages provide for S104.1 No solution provided
the—
a) completion of the access intersections leading
into the Shire Business Centre site;
b) completion of further stages of the internal
loop road;
c) completion of further stages of development
within the precincts;
d) completion of the pedestrian and bikeway
network;
76
The loop road may be completed in stages.
11-69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.