Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections

of 862

Page text shows just the words. Original shows the document exactly as it was published.

                                               4.1.4   Assessment table for the locality—Development other than material change of use
                                                       (Division 11);
            Including amendments 3 July 2017
The Noosa Plan




                                               4.1.5   The Boreen Point, Kin Kin & Cootharaba Locality Code comprising—

                                                       a)    General provisions for the Boreen Point, Kin Kin & Cootharaba Locality Code
                                                             (Division 12);

                                                       b)    Overall outcomes for the Boreen Point, Kin Kin & Cootharaba Locality (Division 13);

                                                       c)    Specific outcomes for the Boreen Point, Kin Kin & Cootharaba Locality (Division 14);
                                                             and

                                                       d)    Specific outcomes for each zone in the locality including—

                                                               i         Detached Housing Zone (Division 15);

                                                              ii         Village Mix Zone (Division 16);

                                                             iii         Community Services Zone (Division 17);

                                                             iv          Industry Zone (Division 18);

                                                              v          Rural Settlement Zone (Division 19);

                                                             vi          Rural Zone (Division 20);

                                                            vii          Open Space Recreation Zone (Division 21); and

                                                            viii         Open Space Conservation Zone (Division 22).


                                               Division 2—General provisions for assessment tables

                                               4.2     Categories of development and assessment
                                                       The categories of development and assessment for each type of development are
                                                       identified in column 2 of tables 4.1 to 4.9. The types of development are as follows—

                                               4.2.1   Tables 4.1 to 4.8— making a material change of use for a defined use, another use in a
                                                       defined use class, or an undefined use, listed in column 1; or

                                               4.2.2   Table 4.9— development other than material change of use, listed in column 1 and
                                                       including—

                                                       a)          Carrying out building work not associated with a material change of use;

                                                       b)          Carrying out building work if demolition, relocation or removal of a building and not
                                                                   associated with a material change of use;

                                                       c)          Placing an advertising device on premises;

                                                       d)          Reconfiguring a lot;

                                                       e)          Carrying out operational work associated with a material change of use where a
                                                                   Development Permit for material change of use has been issued;

                                                       f)          Carrying out operational work associated with reconfiguring a lot where a
                                                                   Development Permit for reconfiguring a lot has been issued;

                                                       g)          Carrying out operational work for the construction of a driveway for a Detached
                                                                   House;



                                                                                                     4-2
Log in to download the original file

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB).pdf · 9.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.