Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
4.1.4 Assessment table for the locality—Development other than material change of use
(Division 11);
Including amendments 3 July 2017
The Noosa Plan
4.1.5 The Boreen Point, Kin Kin & Cootharaba Locality Code comprising—
a) General provisions for the Boreen Point, Kin Kin & Cootharaba Locality Code
(Division 12);
b) Overall outcomes for the Boreen Point, Kin Kin & Cootharaba Locality (Division 13);
c) Specific outcomes for the Boreen Point, Kin Kin & Cootharaba Locality (Division 14);
and
d) Specific outcomes for each zone in the locality including—
i Detached Housing Zone (Division 15);
ii Village Mix Zone (Division 16);
iii Community Services Zone (Division 17);
iv Industry Zone (Division 18);
v Rural Settlement Zone (Division 19);
vi Rural Zone (Division 20);
vii Open Space Recreation Zone (Division 21); and
viii Open Space Conservation Zone (Division 22).
Division 2—General provisions for assessment tables
4.2 Categories of development and assessment
The categories of development and assessment for each type of development are
identified in column 2 of tables 4.1 to 4.9. The types of development are as follows—
4.2.1 Tables 4.1 to 4.8— making a material change of use for a defined use, another use in a
defined use class, or an undefined use, listed in column 1; or
4.2.2 Table 4.9— development other than material change of use, listed in column 1 and
including—
a) Carrying out building work not associated with a material change of use;
b) Carrying out building work if demolition, relocation or removal of a building and not
associated with a material change of use;
c) Placing an advertising device on premises;
d) Reconfiguring a lot;
e) Carrying out operational work associated with a material change of use where a
Development Permit for material change of use has been issued;
f) Carrying out operational work associated with reconfiguring a lot where a
Development Permit for reconfiguring a lot has been issued;
g) Carrying out operational work for the construction of a driveway for a Detached
House;
4-2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.