Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
Column 1 Column 2 Column 3
Including amendments to 3 July 2017
Type of development Categories of development and Assessment benchmarks for
The Noosa Plan
assessment assessable development 63
and requirements for accepted
development
issued
Carrying out operational Code assessment If code assessment —
work associated with a) Landscaping Code; and
reconfiguring a lot b) Engineering Works Codes
where Development
Permit for reconfiguring
a lot has been issued
Carrying out operational Accepted development subject to If accepted development subject to
work for the requirements requirements—
construction of a Column 2 of Table 14.48 of the
driveway for a Code assessment if not Detached House Driveways Code
Detached house; or complying with column 2 of Table
Community residence 14.48 of Detached House If code assessment —
Driveways Code Detached House Driveways Code.
Carrying out operational Code assessment If code assessment —
works for prescribed a) Tewantin and Doonan Locality
tidal works68 Code69; and
b) Table 14.64 of Watercourse
Works Code70
Excavation or filling of Accepted development subject to If accepted development subject to
land not associated with requirements7172 if— requirements—
a material change of a) in either the Detached a) Column 2 of Table 14-52,
use (not for the purpose Housing Zone or the Semi- Earthworks Code; and
of constructing a dam) Attached Housing Zone and b) Column 2 of Table 14-53 of the
involving less than 10m 3 of Erosion and Sediment Control
material; or Code
b) in all other zones and
involving less than 100m 3 of If code assessment —
material a) Earthworks Code; and
b) Erosion and Sediment Control
Code assessment if— Code.
a) not complying with Column 2
of Table 14-52 of the
Earthworks Code; or
b) in either the Detached
Housing Zone or the Semi-
Attached Housing Zone and
involving 10m3 or more of
material; or
c) in all other zones and
involving 100m3 or more of
material
Excavation or filling not Accepted development subject to If accepted development subject to
associated with a requirements73 if— requirements—
material change of use a) Column 2 of Table 14-52 of the
for the purpose of a) Rural Settlement Zone and Earthworks Code; and
68
Prescribed tidal works is defined in Schedule 4A of the Coastal Protection and Management Regulation 2003 and
includes tidal works outside Noosa Waters lock system.
69
Consistent with section 2.10, the Noosa River takes on the same zoning as the adjoining land. The provisions for the
Tewantin and Doonan Locality and the relevant zone therefore apply.
70
The Prescribed Tidal Works Code under Schedule 4A of the Coastal Protection and Management Regulation 2003 also
applies.
67-68
This applies only once to any premises.
72
This applies once to any premises
73
This applies once to any premises
12-34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.