Original source · versioned page text
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
Table 13.4 Categories of development and assessment for the Heritage Overlay—
Development Other Than A Material Change Of Use
Including amendments to 3 July 2017
Column 1 Column 2 Column 3
The Noosa Plan
Type of development Categories of development Assessment benchmarks for
and assessment assessable development and
requirements for accepted
development
Carrying out building work not Accepted development if the If accepted development – no
associated with a material criteria for code assessment do assessment benchmarks apply
change of use not apply
If code assessment—
Code assessment if— Heritage Overlay Code
a) on a heritage site and
involving external building
work; or
b) within a character area
and involving external
building work that
involves—
i) extensions or new
buildings forward of
the existing front
building alignment19;
or
ii) extensions or new
buildings not forward
of the existing front
building alignment
and greater than
10m2 ;
iii) enclosing a front
veranda; or
iv) a change of external
building material to
the front or side
elevation; or
v) a change of window
placement or window
design in the front
façade.
Carrying out building work if Accepted development if the If accepted development – no
demolition, relocation or criteria for code assessment do assessment benchmarks apply
removal of a building not apply
Code assessment where If code assessment—
involving a heritage site or Heritage Overlay Code
within a character area
Placing an advertising device Accepted development if the If accepted development – no
on premises where not criteria for code assessment do assessment benchmarks apply
associated with a material not apply
change of use
Code assessment if not a Low If code assessment—
Impact Sign and located on a Heritage Overlay Code
heritage site or within a
character area
19
For a corner allotment, the front building alignment is taken to be the building alignment fronting both streets.
13-19
Heritage Overlay
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.