Skip to the record
Noosa’s premier civic archive.

Council archive · source document

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections

of 862

Text shows just the words. Original shows the document exactly as it was published.

                                                                      Column 1                                               column 2
            Including amendments to 3 July 2017




                                                                  Specific Outcomes                         Probable solutions (if code assessment)
The Noosa Plan



                                                  Rehabilitation                                            No solution provided
                                                  O102 Rehabilitation of the site, over the life of the
                                                  project and on its completion:
                                                  a)    provides for progressive/ staged rehabilitation
                                                        works;
                                                  b)    includes appropriate clean-up works (taking
                                                        particular account of areas of possible soil or
                                                        water contamination);
                                                  c)    results in a stable final landform;
                                                  d)    provide suitable drainage and hydraulic
                                                        conditions; and
                                                  e)    achieves a suitable degree of revegetation
                                                        consistent with potential post-extraction land
                                                        uses.

                                                  O103 Rehabilitation allows for suitable use of any
                                                  water storage created through the extraction
                                                  process, having regard to water quality, hydraulic
                                                  conditions, land form and vegetation.

                                                  O104 Resource extraction activities in proximity to       No solution provided
                                                  the Noosa River system only occur where—
                                                  a)   there is a clear demonstrated need;
                                                  b)   no feasible and prudent alternatives are
                                                       available; and
                                                  c)   it can be demonstrated that the intrinsic
                                                       natural values and resources of the river
                                                       system can be managed and protected in an
                                                       ecologically sustainable manner.
                                                  O105 Industrial business Type 3 Extractive uses           No solution provided
                                                  are designed, located and operated to ensure—
                                                  a) haulage routes associated with extractive
                                                      resources—
                                                         i    are located on roads where the haulage
                                                              route will minimise adverse impacts on
                                                              residential and urban residential
                                                              amenity;
                                                         ii   are located on roads which are of
                                                              adequate construction and which may
                                                              be upgraded as part of the utilisation of
                                                              the extractive resource; and
                                                         iii are adequately maintained as a part of
                                                              the utilisation of the extractive resource;
                                                              and
                                                  b) the utilisation of any extractive resource does
                                                      not result in adverse visual impacts from major
                                                      roads; and
                                                  c) the rehabilitation of extractive industry sites,
                                                      prior to or in conjunction with land use changes
                                                      on the site of the resources or within buffers to
                                                      the resource.




                                                                                                    14-32
                                                                                             Business Uses Code
Log in to download the original file

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB).pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.