Council archive · source document
2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
Water Quality Management
O26 Camp grounds are located, designed and S26.1 For self-assessment, campgrounds,
managed in a manner to have no impact on the including self-contained RV Overnight areas
quality of drinking water catchments of Lake are not located within the Water Supply
Macdonald, Mary River or Cedar Pocket Dam. Catchment shown on Overlay Maps OM1.5,
OM3.5 or OM5.5.
AND
S26.2 Campsites and associated facilities
are at least 400m from the upper flood
margin of Lake Macdonald15, 100m from the
surveyed bank of a permanent watercourse
and 50m from the bank of an intermittent
water course where located in a water
supply buffer area.
Vehicular access and circulation
O27 Vehicular access and parking does not S27.1 All camping or overnight parking of
adversely impact on the safety, capacity and recreation vehicles occurs on site and not
operation of the road network or pedestrian within the road reserve;
environment. AND
S27.2 Adequate parking and vehicular
manoeuvring area is provided on site so all
vehicles enter and leave the site in a forward
gear.
Density
O28 Outside of urban settlements the scale and S28.1 Outside of the urban settlements:-
density of the camp ground is appropriate to its a) For camp grounds , other than a self-
setting and does not detract from the rural or contained RV overnight area−
environmental character of the local area. i) the site density does not exceed
20 camp sites per hectare
ii) the maximum number of camp
sites on any site does not exceed
100; and
b) For self-contained RV overnight
areas−a maximum of 5 caravans or
recreational vehicles are parked on
site at any one time.
Length of stay
O29 On-site accommodation is not used as S29.1 Resident guests of the campground
permanent residential accommodation. stay no longer than 30 nights in a year
15
The upper flood margin for Lake MacDonald is 98.5m AHD and for Cedar Pocket Dam is RL105m AHD.
14-39
Community Uses Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.