Skip to the record
The only place to find full transcripts.

Council archive · source document

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections

of 862

Text shows just the words. Original shows the document exactly as it was published.

                                                                    column 1                                           column 2
            Including amendments to 3 July 2017




                                                                Specific Outcomes                          Acceptable solutions (if accepted
The Noosa Plan



                                                                                                         development subject to requirements)
                                                                                                        Probable solutions (if code assessment)
                                                  not have an adverse flooding impact on the
                                                  flooding and drainage characteristics off-site.
                                                  Geotechnical considerations                         For assessable development—
                                                  O3 Earthworks do not result in geotechnical         S3.1 Filling works are undertaken in
                                                  instability on the premises or nearby premises.     accordance with Section 2.8- Filling of Site of
                                                                                                      Council’s PSP5 - Engineering Design
                                                                                                      Standards- Roads and Drainage & Earthworks
                                                                                                      AND
                                                                                                      S3.2 Where the filling is for residential
                                                                                                      commercial or industrial purposes the works
                                                                                                      comply with Australian Standard - Guidelines for
                                                                                                      earthworks on commercial & residential
                                                                                                      development.
                                                  Local amenity
                                                  O4 Earthworks do not cause disturbance to           S4.1 The following control measures are
                                                  the amenity of the neighbouring land.               implemented—
                                                                                                          a) regular water spraying of exposed
                                                                                                              areas to suppress dust;
                                                                                                          b) provision of dust stabilised or sealed
                                                                                                              internal roads;
                                                                                                          c) protective covering of exposed areas
                                                                                                              that are left for more than 2 weeks; and
                                                                                                          d) if there is no valid development permit
                                                                                                              for the site, disturbed areas are
                                                                                                              revegetated using species identified in
                                                                                                              PSP3 - Landscaping Plants and
                                                                                                              Guidelines;
                                                                                                      AND
                                                                                                      S4.2 Earthworks are undertaken only during
                                                                                                      the hours of 7am to 6pm, Monday to Friday and
                                                                                                      7am to 6pm on Saturday. No work is
                                                                                                      undertaken on Sunday or public holidays.
                                                  Vegetative Waste
                                                  O5 Vegetation cleared from a development            S5.1 Cleared vegetation is transported off-site
                                                  site is disposed of in an environmentally           for disposal in an approved green waste
                                                  responsible manner.                                 disposal facility;
                                                                                                      OR
                                                                                                      S5.2 Cleared vegetation is mulched on-site and
                                                                                                      reused for landscaping of the finished
                                                                                                      development;
                                                                                                      OR
                                                                                                      S5.3 Cleared vegetation is disposed of for the
                                                                                                      purpose of firewood. (Note: Disposal of
                                                                                                      vegetative waste by burning off is not an
                                                                                                      acceptable method of disposal).
                                                  Managing contamination risk
                                                  O6 Materials used as fill are suitable for          S6.1 The fill material is solid clean earth, free of
                                                  development of the land and filling or excavation   putrescible or refuse material, vegetation, acid
                                                  works do not result in the contamination of land.   sulfate soils, building or construction material or
                                                                                                      other material or contaminants;
                                                                                                      AND
                                                                                                      S6.2 The site is not on the contaminated land
                                                                                                      register.


                                                                                                  14-128
                                                                                             Earthworks Code

Used in these records

About this file

File size
9.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-11-07 P&E Committee - Attachment 1 to Item 1 - Amendments for Multiple Housing Type 2 Duplex & Minor Corrections(PDF, 9MB).pdf · 9.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.