PROJECT URBAN – 20152                                                                                1 Jul 2020


Performance Criteria            Acceptable Solution                              Comments
Design, construction and safety – jetties and piers
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).

Performance Criteria             Acceptable Solution                             Comments
Design, construction and safety – pipelines and other underground services
17.1       The design and (s 5(2) outcome)                                       Not applicable.
construction of prescribed The design and construction of the
tidal works that are a pipeline, pipeline or underground service is              The proposal is not a pipeline
or another underground consistent with the following standards:-                 or    another    underground
service    ensures      vessels a) subject to paragraph (b):-                    service.
anchoring near the works             (i)      for a pipeline that is gas or
cannot interfere with, or                     liquid petroleum pipeline –
damage, the works.                            AS/NZS 2885 to the extent
                                              requirements stated in the
                                              Standard apply to the design
                                              or construction of the pipeline;
                                              or
                                     (ii)     for another pipeline or other
                                              underground service – the
                                              pipeline or service is installed
                                              at least 1.2m below the surface
                                              of land, after it is installed;
                                 b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).


Performance Criteria            Acceptable Solution                              Comments
Design, construction and safety – pontoons
18.1 Prescribed tidal works (s 5(2) outcome)                                     Not applicable.
that are a pontoon and not
used only for rowing, are The design and construction of the                     The structure is not a pontoon.
designed and constructed in a pontoon is consistent with the following
way to ensure it is able to standards:-
support its intended loads, a) subject to paragraph (b), each of the
having regard to its relevant       following Australian Standards to the
loading matters.                    extent requirements stated in the
                                    Standard apply to relevant loading
                                    matters for the design or construction
                                    of the jetty or pier:-
                                             (i) AS/NZS 1170.0;
                                             (ii) AS/NZS 1170.1;
                                             (iii) AS/NZS 1170.2;
                                             (iv) AS1170.4
Development Assessment Report                                                                       Page 30 of 42
Operational Works
35 Mossman Court, Noosa Heads 4567

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05. Hales - Planning Report.pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.