132005.2342.2 Application to extend existing approval - 3 Hollett Rd Noosaville

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                                                          Powell Unit Trust
                                                                             PO Box 1609
                                                                        Noosaville DC 4566

                                                                        December 8th 2010

Sunshine Coast Regionalouncil
                        C-
                                                                           SCRC   C   ORRESPONDE   NCE
to whom it may concern:

in answer to your question regarding reasons and justification for the requested extension,
our lives have changed dramatically since we first made the application for Material
Change of Use for our property at 3 Hollett Rd, Noosaville.

We originally intended to expand our veterinary practice, which was located at 15 Hilton
Tce, to the site. The Hilton Tce premise was to become a branch practice of the purpose
built facility at Hollett Rd.

During the time that it took to gain approval for the MCU, local competition in the
Veterinary industry increased and we found it untenable to make use of the Approval once
we received it.

We also found it unpalatable to continue to do business in Noosaville in the light of the
new competition which had emerged. We therefore sold our business, and the business
sale contract precludes us from working locally for a number of years in the Veterinary
industry.

We are therefore marketing the Hollett Rd property for sale. An extension of time for the
MCU will maximise the value of the property, and allow a new owner time to develop it for
their own business.

I trust this is a satisfactory explanation.

Yours sincerely,
Jane Powell
                               kll-k   pol") CA
Ph: 0407620070



                                   Box:   . Y071' R:.....    .,.,

                                                 Q^s a a l



    nq.v;,"'e Coate- 12.e^ UVI1,01 Cau nu
Full text of the other 2 pages

Page 2

       U nSI I' n e Coast                                    Request to Change Existing Approval and/or
                                                                          Extension to Relevant Period

NOTES:                                                                        Which entity issued the approval?
ALL questions MUST be completed unless the form indicates                          Sunshine Coast Regional Council
otherwise.                                                                         Other entity-please specify:      N<x,;A           Co Jl\,   Gi L.
This form must be submitted to Council accompanied by the
                                                                             Is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form.                     No
If Council was the Assessment Manager for the existing approval,                   Yes - complete below
and the approval was issued by the Court, then:-
                                                                             Insert the name of each local government area in which the
(a)    a request to change the development approval and/or                   mobile and temporary ERA is proposed to
       conditions is made to the Court; and
                                                                             operate/operating.
(b)     a request to extend the relevant period for the approval is
        made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.                                                            I 3.         Nature of request

                                                                             Please tick ALL applicable categories
1.        Details of the person making the request
                                                                                   To change the development approval
Full name - individual or company                                                  To change the development conditions
     po t,)             y r\l Ir        r RU S r^                                  To extend the relevant period before lapsing

Contact name -for company                                                               Please attach documentation outlining the details of
                                                                                        and the reasons and justification for the requested
      - -o A
           " C.      P O w C-L. L__                                                     change or extension.
Postal address
                                                                                         Location of the premises
              dk
                                                                             Street address
 N1 OSAJ k L.LE                        LPostcode ^^U-2                        Unit no.     Street no.   Street name

Contact phone number                Fax number - if applicable                                 3          H rn c i .rr-- 2r                         I
                                                                             Suburb                                     Postcode
                                                                      I                                                        ^Qtz,
Mobile number - if applicable
      O4 c^ -1'                     1-0                                      Lot and plan description
                                                                              Lot no.      Plan type & plan no.
E-mail address - if applicable



2.        Details of the existing approval
Type of approval -please tick ALL applicable categories
       Development Permit
       Preliminary Approval                                                  5.          Concurrence Agencies
       Compliance Permit                                                     Was there one or more concurrence agencies involved in
       Material Change of Use                                                the original approval?
       Reconfiguring a Lot
                                                                            E No
       Operational Works                                                           Yes - provide details below
       Building Works                                                        Note - Under s372 of the Sustainable Planning Act 2009 the person
       Plumbing or Drainage Works                                            making the request is required to give a copy of this request to all
                                                                             concurrence agencies.
       Compliance Certificate
       Environmentally Relevant Activity (ERA)                               Concurrence Agency                            Date copy given

Application number             Date issued
                                                                                                                             %/jot iO
                                                                             Oil r-l                              3$c1        / /
                        a3C.^ ^ . S
                                                                            off;                 q u,",--
                   :°! m nnfj               u n te
!PD-DA-FM401/1-30/01c1rf004 20 10                                                                                             Page 1 of 2




                  Namnbour

Page 3

 6.          Pre-request response notice                                     8.       Does the request involve a State resource
                                                                                      prescribed under the Sustainable Planning
 Has a pre-request response notice been given by a relevant
                                                                                      Regulation 2009, Schedule 14?
 entity (e.g. a concurrence agency) for this request?

'Nsi    No
        Yes
                                                                            N
                                                                                   No
                                                                                   Yes - complete Table C below
          If yes, please attach a copy of the notice.
                                                                             Table C - State owned resource
                                                                             Nature of State owned resource
 7.          Owner's consent                                            I
 Is the owner's consent required for this request?
        No                                                                   Nature of evidence required
        Yes - complete either Table A or Table B below                            Evidence of allocation of /entitlement to, the resource
 Note - If more than one owner of the land all owners' details are                Evidence the chief executive has agreed to the request
 required.
                                                                                     Attach a copy of the evidence required above.
 Table A - owner's consent provided on form
 Owner's name/s                                                              NOTES: For question 8
                                                                             Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
 I/We, the above-mentioned owner/s of the land, consent to                   that if an application for the development approval were made at
 the making of this request.                                                 the time of making this request and evidence under section 264(1) of
 Signature/s                                                                 the Sustainable Planning Act 2009 would be required to support the
                                                                             application, this request must be accompanied by the written
 Date                                                                        agreement of the chief executive from whom evidence would be
                                                                             required under section 264(1).
                                                                             Section 264 of the Sustainable Planning Act 2009 provides that if a
                                                                             development involves a State resource, a regulation may require the
 Table B - owner's consent attached                                         application to be suppeted by certain evideneeprescribedunder
 Owner's name/s                                                              regulation. Schedule 14 of the Sustainable Planning Regulation 2009
                                                                             prescribes the State resources for which evidence is required to be
                                                                             given, and the evidence required, to support the application.
        The owner's written consent is attached.

 NOTES: For question 7
                                                                             9.       Applicant's declaration
 Under section 371 of the Sustainable Planning Act 2009, if the              Signature/s:
 person making the request is not the owner of the land to which the
 approval relates, the request must be accompanied by the owner's
 consent.
 However, owner's consent is not required if the approval:
 •     relates to land the was acquisition land to which section             By maki this request, I declare that all information in this
       263(2)(d) of the Sustainable Planning Act 2009 applied when           request 'l rue and correct.
       the application for the approval was made; or
 •     is for building work or operational work for the supply of
       community infrastructure on land designated for the
       community infrastructure; or
 •     the consent of the owner would not be required under section
       263(1) of the Sustainable Planning Act 2009 if a development
       application were made for the requested change.
 Also, owner's consent is not required if the Assessment Manager is
 satisfied that.
 •     the number of owners of the land make it impractical to obtain
       owners' consent, and the requested change does not materially
       affect the owners' land; or
 •     having regard to the nature of the proposed change, the owner
       has unreasonably withheld consent and the requested change
       does not materially affect the owner's land.




 PD-DA-FM401 /1-3010412010                                                                                                   Page 2 of 2

Used in these records

About this file

File size
214 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

132005.2342.2 Application to extend existing approval - 3 Hollett Rd Noosaville.pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.