CONCLUSION
The report has reviewed the pre and post development scenario for the subject and external catchment
hydrology to ensure non-actionable nuisance of flows.
In summary, the development on the subject site will result in non-actionable nuisance of stormwater runoff
quantities with minor flows to outlet to the existing stormwater pipe network in the rear of the property. This
system will be upgraded to accept the proposed calculated flows.
Due to the proposed design of the building, overland flows from major events will be diverted to the Bartlett
Road frontage in the north. This will ensure any pipe blockages will not create flooding to the tenancies.
It is anticipated the report, when reviewed in conjunction with the planning report and the development plans;
will assist in supporting the application seeking development approval.
Yours Faithfully,
GLENN AINSWORTH
MIEAust CPEng NER RPEQ CPESC
BAX ENGINEERING PTY. LTD.
Ph: 0407 021 300
Page 13 of 14
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.