Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment C - SWMP Report by Bax Engineering_compressed

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Gumdale Court to the south. This stormwater system will be upgraded to a 300mm diameter pipe from the
connection to the existing pit located adjacent in 11 Bartlett Street. This will collect minor storm events and
roof water runoff while major events will be directed to the Bartlett Road frontage. Earthworks will be needed
to achieve these design levels to allow overland flow to reach the Bartlett Street frontage.


Based on the post-development impervious fraction the site was calculated to have a peak flow for a 1% AEP
design storm event as 0.054 m3/s.
Of this volume 0.033 m3/s is a minor storm event and would be directed to the existing pipe system. The
remaining volume of 0.021m3/s would be directed to the Bartlett Street frontage.




Figure 2 – Stormwater Network and Contour Plan
Source: Noosa Council Mapping




                                              Page 6 of 14
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092           [email protected]
Log in to download the original file

Attachment C - SWMP Report by Bax Engineering_compressed.pdf · 8.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.