               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Graduate Development Engineer, Daniel Epps
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                MCU23/0163 OPW23/0199

                    Applicant                      DD Sunnyside Pty Ltd

                    Proposal                       Material Change of Use - Landing – Residential
                                                   Operational Works – Landing & Jetty

                    Properly Made Date             20 December 2023

                    Information Request Date       22 January 2024

                    Information Response Date      19 February 2024

                    Decision Due Date              28 March 2024

                    Report Reviewed &              Morgan Gaffney – 5 March 2024
                    Finalised By


                    PROPERTY DETAILS

                    Property Address               30 Mossman Ct Noosa Heads Qld 4567

                    RP Description                 Lot 149 N 21859

                    Land Area                       610.0000 m²

                    Existing Use of Land           Residential


                    STATUTORY DETAILS

                    SEQRP Designation              Urban Footprint

                    Zone                           Low Density Residential

                    Precinct                       Not Applicable

                    Local Plan Area                Noosa Heads Local Plan

                    Overlays                       Acid Sulfate Soils, Flood Hazard

                    Assessment Type                Code

               1.      PROPOSAL
               The application seeks approval for a Material Change of Use - Landing – Residential and
               Operational Works – Landing & Jetty.



Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024
Full text of the other 5 pages

Page 2

               The locality and proposal plan are included below.




                                                       Figure 1 – Locality




                                                      Figure 2 – Site Plan


                                                                             Page 2 of 6

Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024

Page 3

               2.      SITE DETAILS
               2.1. Background
               There is no higher order approval requiring the works.
               2.2. Site Description
               The site is located at the head of the Mossman Court cul-de-sac.
               3.      ASSESSMENT
               The proposed development includes the construction of a residential pontoon & gangway along
               Mossman Court, Noosa Heads. The pontoon & gangway meets the relevant provisions of The
               Noosa Plan 2020. Engineering recommends the following conditions.
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •       State Planning Policy;
               •       South East Queensland Regional Plan;
               •       Planning Regulation 2017; and
               •       Noosa Plan 2020.
               3.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •       Low Density Residential Zone Code;
               •       Noosa Heads Local Plan Code; and
               •       Waterway Works Code.
               The application has been found to generally comply with all applicable statutory instruments.
               4.      CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •       Senior Development Planner
               5.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No MCU23/0163 for a Material Change of Use - Landing - Residential
               and OPW23/0199 for an Operational Works – Landing & Jetty situated at 30 Mossman Ct Noosa
               Heads Qld 4567 and described as Lot 149 N 21859, it is recommended the application be approved
               in accordance with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:           MCU23/0163



                                                                                                     Page 3 of 6

Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024

Page 4

                   Street address:               30 Mossman Ct Noosa Heads Qld 4567

                   Real property description:       Lot 149 N 21859

                   Planning Scheme:              Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Approval for Material Change of Use - Landing – Residential
               •       Development Permit for Approval for Operational Works – Landing & Jetty
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                       Approved Plans
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                          Plan No.              Rev.    Plan/Document Name                        Date

                          TJS-SJ-04870-02       B       Layout Plan                               2    February
                                                                                                  2024
                                                        Prepared by The Jetty Specialist

                          TJS-SJ-04870-03       B       Elevation                                 2    February
                                                                                                  2024
                                                        Prepared by The Jetty Specialist

                       Currency Period
               2.      The Currency Period for this development approval lapses if all conditions have not been
                       complied with, and the plan of survey lodged with Council for endorsement by 23 February
                       2026, unless an application to extend the currency period is approved by Council.
                       Performance Bond
               3.      Security in the form of a cash bond or trading bank guarantee to the sum of $2,000 must be
                       submitted to Council, to secure performance of all conditions of this approval, prior to the
                       commencement of the works. The cash bond or trading bank guarantee will be returned on
                       performance of the conditions of this approval less any costs incurred by Council in respect
                       of enforcing performance of this permit. Council reserves the right to call upon the bond or
                       guaranteed sum to effect compliance with conditions.
                       General Conditions
               4.      The maximum number of vessels that may be berthed, moored, attached or stored on the
                       structure must not exceed 2.
               5.      The use of the pontoon must not cause any adverse effects on the amenity of the surrounding
                       areas including changes to light, views, air quality and noise.
               6.      Vessels berthed/moored at the pontoon must be located a minimum of 3.0 metres from the
                       prolongation of the property boundaries.
               7.      Vessels and boatlifting devices must be connected directly to the pontoon, and not located
                       side by side or in tandem with another vessel.


                                                                                                      Page 4 of 6

Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024

Page 5

               8.     All structures must be designed and constructed such that they are free standing within the
                      waterway and are not connected to or behind the revetment wall.
               9.     All structures must have no detrimental effects on stormwater drains and/or easements.
               10.    A rigid handrail must be fitted on one side of the gangway. The handrail must be of an open
                      design and in accordance with the approved plans.
               11.    No posts or vertical supports of the proposed pontoon are to extend vertically from the
                      structure unless they provide necessary support for the handrail.
               12.    No boatlifting devices are to be attached or moored at the pontoon structure for the purpose
                      of elevating a vessel above the water without Council approval.
               13.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               14.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               15.    The pontoon is to be used for private purposes only with no commercial operations to be
                      undertaken.
               16.    Boat repair activities are not permitted on site.
               17.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               18.    The mooring facility must not be utilised for live-aboard purposes.
               19.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               20.    Certification by a Registered Professional Engineer of Queensland that states that the
                      pontoon is constructed in accordance with best practice methods and is structurally sound
                      must be submitted to Council. This certification must be submitted to Council within three (3)
                      months of the completion of the works. A final inspection and approval of the structure by
                      Council’s Inspector is also required. Please contact Council’s Development Assessment
                      Branch on 5329 6500 to arrange the inspection.
               21.    This approval lapses where the construction of the pontoon has not commenced within two
                      (2) years of the date of issue of the approval unless application is made and approved by
                      Council for an extension.
               22.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.




                                                                                                       Page 5 of 6

Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024

Page 6

               2.     The approval or conditions do not absolve the owner of the land from complying with all the
                      conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
                      statues and/or statutory regulations in the execution and/or performance of said works.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               5.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                         Page 6 of 6

Document Set ID: 22822207
Version: 4, Version Date: 06/03/2024

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU23 0163 [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.