Log in to see the plans as drawnPLANTING SCHEDULE GENERAL NOTES SOIL:
Spread turf underlay topsoil to a minimum depth of 100mm unless otherwise directed. Proposed topsoil must
A. ARCHITECTURAL WORKS INFORMATION comply with Australian Standards AS4419-2003.
The spacing of plants shown on plan have been derived as a compromise between growth rate, anticipated size, and the ability to provide a good vegetative cover within a reasonable space of time. Quantities indicated have been based on the spacing of individual plants appropriate to the
available area for the particular species used; where this available area increases (or decreases) through the course of construction, quantities may also need to increase (or decrease) to maintain the plant spacings indicated on plan. Refer to Architect's drawings for all information contained within these documents related to and nominated as
Architectural Works. This includes all hardscape items such as paving, outdoor structures/shelters, walls and TURF:
fencing. Architectural Works information contained within these documents are indicative only and not for To be fundamentally free from weeds and disease or other deleterious substances.
CODE SPECIES COMMON NAME SIZE** QUANTITY SPACING HEIGHT WIDTH construction or certification purposes. • On road reserve: Use "Wintergreen" (ie: Lawn Solutions Australia, contact 0432 707 950)
• Within subject site: Use "Platinum Zoysia" (ie: Lawn Solutions Australia, contact 0432 707 950)
B. CIVIL WORKS INFORMATION
Refer to Civil Engineer's drawings for all information contained within these documents related to and INSTALLATION:
TREES nominated as Civil Works. Civil Works information contained within these documents are indicative only and Turf shall be close turfed with staggered cross-joints and laid in straight lines, running perpendicular to the
ANDREW GOLD LANDSCAPE ARCHITECTURE
not for construction or certification purposes. contours.
PO BOX 5220
All joints shall be filled with an approved topdress light soil or sand and the turf shall be lightly rolled. MT GRAVATT EAST
Bi Banksia integrifolia Coast Banksia 45L 3 as shown 12 5 C. STRUCTURAL WORKS INFORMATION Finished levels shall be 3mm below surrounding surface levels to allow for future top dressing. Allowance QLD 4122
Ca Cupaniopsis anacardioides Tuckeroo 45L 2 as shown 10 5 Refer to Structural Engineer's drawings for all information contained within these documents related to and should be made for shrinkage and settling.
nominated as Structural Works. This includes retaining walls. Structural Works information contained within Turf shall be adequately watered once installed. T 07 3420 0006
Ghg Grevillea Honey Gem Grevillea 45L 2 as shown 5 4 these documents are indicative only and not for construction or certification purposes. Ensure protection from trampling.
M 0405 389 243
E [email protected]
Pt Pandanus tectorius Screw Pine 25L 1 as shown 5 5
D. ELECTRICAL WORKS INFORMATION FERTILISER:
Refer to Electrical Engineer's drawings for all information contained within these documents related to and Fertiliser to be applied to the turf at the rates and period of time from installation as recommended by the
SCREENING SHRUBS nominated as Electrical Works. Electrical Works information contained within these documents are indicative supplier. If no starter Fertiliser supplied by the supplier, we recommend:
and not for construction or certification purposes. Dynamic Lifter Turf Starter:
http://www.yates.com.au/products/fertilising/organic-based/dynamic-lifter-turf-starter/#tbCQXOZuFJZ01z1B.97
E. HYDRAULIC WORKS INFORMATION Lawn Builder™ Seed & Turf Starter Slow Release Lawn Fertiliser:
CAL W Callistemon Wildfire Bottlebrush 200mm 3 1.8 2.5 2 Refer to Hydraulic Engineer's drawings for all information contained within these documents related to and https://www.scottsaustralia.com.au/scotts-brands/lawn-builder/lawn-builder-slow-release-lawn-fertilisers/
SYZ R Syzygium australe Resilience Lillypilly 200mm 2 1.5 3 2.5 nominated as Hydraulic Works. Hydraulic Works information contained within these documents are indicative lawn-builder-seed-turf-starter-slow-release-lawn-fertiliser/
only and not for construction or certification purposes.
SOIL WETTING AGENT:
We recommend the application of a soil wetting agent wetting agent (ie: non biodegradable detergent not
SHRUBS AND GROUNDCOVERS LANDSCAPE SPECIFICATION NOTES crystals ) to stop hydrophobia if not already in the starter fertiliser supplied with the turf, at the rates
recommended by the manufacturer:
LEVELS-GENERAL NOTES • Scotts Hydraflow Wetta Soil
Finish organic mulch surfaces 25 - 40mm below adjacent paving surfaces and/or edging. Finish lawn surfaces • Searle’s Penetraide
BAN CC Banksia spinulosa Coastal Cushion Banksia 140mm 9 1 0.5 1 flush with adjacent paving surfaces and/or edging. Ensure adequate falls in finished surface levels away from • Plant of Health Soils Soaker
CAR gla Carpobrotus glaucescens Pigface 140mm 4 1.5 0.3 3 buildings to drainage collection points (eg, field inlets, etc).
CAS CI Casuarina glauca Cousin It Prostrate Casuarina 140mm 2 1 0.3 1.5 WEEDS, PESTS DISEASE MANAGEMENT
SUBSOIL DRAINAGE - GENERAL NOTES Weeds are required to be removed by physical or chemical (Glyphosate or other herbicides) means. If
CRI ped Crinum pedunculatum Swamp Lily 200mm 4 1 2 2 Ensure adequate subsoil drainage elsewhere by installing suitable agricultural drainage systems where chemical means, as per the manufacturer recommendations. Refer to the following reference for guideline on
GRE lan Grevillea lanigera Mt Tamboritha Prostrate Grevillea 140mm 2 1 0.5 1.5 necessary, and especially in areas subjected to site excavation works including retaining walls. weeds, pest and disease management
LOM KB Lomandra Katie Belles Mat Rush 140mm 19 1 1.5 1.5 REFERENCE:
PLANTS http://thelawnguide.com.au
LOM ver Lomandra Verday Dwarf Lomandra 140mm 68 0.5 0.5 0.6
WES WG Westringia Wynyabbie Gem Native Rosemary 140mm 5 1.5 2 1.5 • NATSPEC shall apply to trees where Council requires this certification. PLANTING BEDS
WES Z Westringia Zenda Dwarf Rosemary 140mm 10 0.9 1 1 • Plants are to be good quality nursery stock from a NIASA Accredited nursery
• They shall be fundamentally free of pest and diseases. SUBGRADE PREPARATION:
• After installation they shall be thoroughly watered. Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil.
TURF TOPSOIL:
Spread topsoil to a minimum depth of 300mm unless otherwise directed. Proposed topsoil must comply with
** PLANT CONTAINER SIZE: SUBGRADE PREPARATION: Australian Standards AS4419-2003.
Turfed areas shall be prepared initially by removing all deleterious material
Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil FERTILIZER:
45L 45 Litre container stock min Min. height at time of planting: 1.8m unless otherwise directed (ie: no cultivation under trees to be retained) A slow slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported
25L 25 Litre container stock min Min. height at time of planting: 1m (or excavated/site topsoil). We recommend the following:
200mm 200mm dia minimum pot size Inorganic Slow or Controlled Release fertilisers:
• Osmocote
140mm 140mm dia minimum pot size • Nutricote
• Macrocote
- • E-Scape PRO by eCo-Enviroment
NOOSA COUNCIL Organic slow release:
• Dynamic Lifter
• Organic Link by Plant of Health
APPROVED PLAN WETTING AGENT:
A wetting agent and/or soil ameliorant including a wetting agent is required to all mass planting beds:
MCU18/0006 & OPW18/0012 • Scotts Hydraflow Wetta Soil
• Searle’s Penetraide Plant of Health Soils Soaker
• Multipro by eCo-Enviroment
10 APR 2018 PLANTING:
As indicated on plan.
ORGANIC MULCHING:
Proposed mulch must comply with Australian Standards AS4419-2012. Spread 1" Hoop Bark (ie:
Greenfingers, contact 5546 1099) to a minimum depth of 100mm entirely over planting bed areas.
GARDEN EDGE
To the locations as indicated on the drawings and details as per the following: Install 100x100mm concrete
garden/mowing edge.
NOTE: ROOTBALL IS LEVEL WITH IRRIGATION
ADJACENT SOIL SURFACE
Planting plan has been designed to survive without an automatic irrigation system. Water additives and water
NOTE: DON'T PILE MULCH TOP VIEW retention elements, along with hardy water-wise plants will ensure an irrigation system is not imperative to the
AGAINST PLANT STEM FALL SOIL SURFACE TO ROOT BALL long-term maturation and survival of the proposed plants. If approved, install an automatic, fixed position, low
TO MAXIMIZE WATER CATCHMENT pressure sprinkler irrigation system to all landscaped areas shown on the drawings internal to the site only, to
Noosa Shire Council approval. The irrigation shall meet the following performance requirements and as per
the manufacturers and/or installers specifications:
100mm DEEP MULCH AS SPECIFIED
(OR AS NOTED OTHERWISE)
HARDWOOD STAKE - DO NOT PENETRATE ROOTBALL - Summer target application of 32mm
WITH STAKE. STAKE TO PENETRATE 200MM MIN. INTO - Fully automatic and metered
ROOT BALL (THOROUGHLY MOIST AND LOOSENED) EXISTING SUBGRADE - Recycled water use (from rainwater tanks)
1.5 B TOPSOIL BACKFILLING AS SPECIFIED - Commercial quality fittings and fixtures
or A 25 / 45 LITRE CONTAINER TREE - Mainlines
250mm THOROUGHLY CULTIVATE SUBGRADE - Dripline system under mulch
WHICHEVER AND LOOSEN SIDES OF PLANTING HOLE HESSIAN TIE NAILED TO STAKE - RPZ backflow prevent device
TIES
IS GREATER
SLOW RELEASE FERTILIZER All design and documentation, materials supplied and work carried out should be in accordance with the
AS SPECIFIED BERMED SOIL DISH current relevant Australian Standards and best practice.
100MM ORGANIC MULCH LAYER
PLANT ESTABLISHMENT / CONTINUING MAINTENANCE
STAKES Allow a 12 WEEK Plant Establishment Period from Practical Completion to the satisfaction of the Landscape
ROOT BALL (THOROUGHLY MOIST AND LOOSENED)
B NOTE: ROOTBALL IS LEVEL WITH Architect.
1.5 X H
GROWING MEDIUM
H
ADJACENT SOIL SURFACE • Maintain adequate watering regime
CULTIVATED SUBGRADE
2B • Remove weed growth from all mass planting beds and turfed areas
UP TO or 150mm • Fertilise (as per the notes above) A 27/02/18 SUBMISSION TO NSC
25L CONTAINER WHICHEVER • Weed control (as per the notes above)
IS GREATER SINGLE STAKE OPTION
SCALE NTS • Prune planting, control pest and disease management (as per the notes above) to maintain healthy growth
• Replenish mulch material where necessary ISSUE DATE REASON
3 X ROOTBALL Ø
• Replace dead / dying plant material
OVER 25L CONR 1.5 B
• Reinstate stakes, ties and marker stakes where necessary THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE
• Reinstate erosion control matting and other erosion control measures as necessary AT THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
TYPICAL PLANTING DETAIL TYPICAL STAKING DETAIL TYPICAL TREE PLANTING DETAIL INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
1 SECTION 1:10 2 SECTION 1:25 3 SECTION 1:100
Continue maintenance works beyond Plant Establishment Period as required. RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
MANAGEMENT PLANS: DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
100mm ORGANIC MULCH LAYER DIMENSIONS ARE TO BE VERIFIED ON SITE.
The turfed areas shall be throughly watered on the day of turf installation and then as follows at the equivalent
CONTINUOUS CONCRETE EDGE of 5l/m², including natural rainfall, or as required to maintain active healthy growth.
100x100mm - TO BE USED AS GUIDE FOR EDGE TRIMMER TOPSOIL AS SPECIFIED
Weeks 1-3: Twice a week
TURF AS SPECIFIED Weeks 3-12: Once a week or as necessary
TURF AND TOPSOIL CULTIVATE EXISTING SUBGRADE
AS SPECIFIED AS SPECIFIED
If no irrigation, apply the above rates to the mass planting beds. Watering to use rainwater tanks if possible.
EXISTING SUBGRADE MINIMUM 300mm DEPTH GROWING
MULCH AS SPECIFIED FINISHED GRADE
MEDIUM / TOPSOIL - REFER TO
SPECIAL NOTE
SPECIFICATION
150 MIN.
FLUSH MINIMUM 150mm TOPSOIL - FREE OF
ROCKS AND DEBRIS REFER TO SPEC. Accord particular diligence to the following prime items: PROPOSED MULTI-UNIT DWELLING
100
CULTIVATED SUBGRADE TO A
TOPSOIL QUALITY and SUBGRADE PREPARATION as specified. 10 HILL STREET, SUNSHINE BEACH
CULTIVATE SUBGRADE DEPTH OF 150mm (MINIMUM)
PLANT QUANTITY: Use only consistently well nurtured nursery stock from an approved supplier. Check with
100
TO A DEPTH OF 150mm MIN.
Landscape Architect where species substitutions must be made.
MAINTENANCE: Ensure a continuing maintenance program, including weed/disease, fertilising, watering (but
NOTES, SCHEDULES, & DETAILS
beware of over-watering) and replacement of ailing plant material.
GUARANTEE
JOB NUMBER SHEET No. ISSUE DRAWN BY
Failure to adequately address these items, best practice and relevant Australian Standards WILL result in a
CONCRETE EDGE DETAIL TYPICAL TURF PLANTING DETAIL TYPICAL GARDEN BED DETAIL
sub-standard landscape outcome. 18.018 2 A AG / AL
4 SECTION 1:10 5 SECTION 1:10
6 SECTION 1:10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.