Original source · versioned page text
Civil Engineering Report
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Local amenity PO4 AO4.1 RO4.1 Earthworks do not cause disturbance to the amenity of the The following control measures are implemented— Complies – The following control measures will be neighbouring land. implemented during construction: a) regular water spraying of exposed areas to suppress dust; a) regular water spraying of exposed areas to suppress dust; b) provision of dust stabilised or sealed internal roads; b) provision of dust stabilised or sealed internal roads; and c) protective covering of exposed areas that are left for more than 2 weeks; and c) protective covering of exposed areas that are left for more than 2 weeks. d) if there is no valid development permit for the site, disturbed areas are revegetated using species identified in PSP3 - Landscaping Plants and Guidelines; AND AO4.2 RO4.2 Earthworks are undertaken only during the hours of 7am Complies – Earthworks will only be undertaken during the to 6pm, Monday to Friday and 7am to 6pm on Saturday. hours of 7am to 6pm, Monday to Friday and 7am to 6pm on No work is undertaken on Sunday or public holidays. Saturday. No work will be undertaken on Sunday or public holidays. l:\9000-9999\9200-9299\9279\code\03-03-22 earthworks code.docx Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.