Original source · versioned page text
Civil Engineering Report
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
EROSION AND SEDIMENT CONTROL CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE PO2 AO2.1 RO2.1 Works in a watercourse Work within waterways must be undertaken in accordance Not applicable – No works are proposed to be undertaken with Best Practice Erosion and Sediment Control, within waterways. Construction activities within watercourses are planned to Appendix I – Instream works, Sections 14 and 16 prevent erosion, construction failure and associated International Erosion Control Association 2008. sedimentation. AO2.2 RO2.2 Temporary vehicular crossings of waterways must be Not applicable – No works are proposed to be undertaken within waterways. designed and constructed to convey flows for the 50%AEP event and remain stable for all rainfall events up to 10%AEP event. l:\9000-9999\9200-9299\9279\code\03-03-22 erosion and sediment control code.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.