Original source · versioned page text
Civil Engineering Report
Original PDF page 52, section 1. The text section number identifies this passage in the reader.
ROADS AND DRAINAGE CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Staged development PO8 AO8 RO8 Staged development is planned, designed and constructed No solution provided. Not applicable – The development is not proposed to be to ensure that— staged. a) each stage of the development can be constructed without interruption to services and utilities provided to the previous stages; b) the infrastructure provided is capable of servicing the entire development; and c) the materials used are consistent throughout the development. Alterations to services and utilities PO9 AO9 RO9 Any alterations or repairs to infrastructure as a result of the Any alterations or repair to infrastructure as a result of the Complies – Any alterations or repairs to infrastructure as a development are made at no cost to Council. development are completed at the developer’s expense. result of the development will be completed at the developer’s expense. l:\9000-9999\9200-9299\9279\code\03-03-22 roads and drainage code.docx Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.