Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Civil Engineering Report

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 55, section 1. The text section number identifies this passage in the reader.

WATER SENSITIVE DESIGN CODE
Performance Criteria and Acceptable Solution
83 Butler Street, Tewantin
3 March 2022

              PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                RESPONSE

PO4                                                                AO4                                                        RO4
Backflow devices or similar systems are installed, where            A suitable backflow prevention device is installed to     Not applicable – No stormwater capture devices are
necessary, to ensure water reuse facilities have no impact          protect the drinking water within the reticulated water   proposed to be constructed as part of the development.
on the quality of the town mains water.                             supply in accordance with AS/NZS 3500:2003 Plumbing
                                                                    and Drainage.




Shire Business Centre
PO5                                                                AO5                                                        RO5
Within the Shire Business Centre site, as shown on Map              No probable solution                                      Not applicable – works are not located within the Shire
SBC run-off treatment is contained within the developable                                                                     Business Centre site
areas of the site and drainage lines are only used for final
polishing of run-off;




PO6                                                                AO6                                                        RO6
Within the Shire Business Centre site, as shown on Map             No probable solution                                       Not applicable – works are not located within the Shire
SBC, on-site detention measures are contained within the                                                                      Business Centre site
developable areas of the site, clear of drainage lines and
Open Space Precincts.




l:\9000-9999\9200-9299\9279\code\03-03-22 water sensitive design code.docx
                                                                                              Page 3
Log in to download the original file

Civil Engineering Report.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.