Original source · versioned page text
Civil Engineering Report
Original PDF page 55, section 1. The text section number identifies this passage in the reader.
WATER SENSITIVE DESIGN CODE Performance Criteria and Acceptable Solution 83 Butler Street, Tewantin 3 March 2022 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE PO4 AO4 RO4 Backflow devices or similar systems are installed, where A suitable backflow prevention device is installed to Not applicable – No stormwater capture devices are necessary, to ensure water reuse facilities have no impact protect the drinking water within the reticulated water proposed to be constructed as part of the development. on the quality of the town mains water. supply in accordance with AS/NZS 3500:2003 Plumbing and Drainage. Shire Business Centre PO5 AO5 RO5 Within the Shire Business Centre site, as shown on Map No probable solution Not applicable – works are not located within the Shire SBC run-off treatment is contained within the developable Business Centre site areas of the site and drainage lines are only used for final polishing of run-off; PO6 AO6 RO6 Within the Shire Business Centre site, as shown on Map No probable solution Not applicable – works are not located within the Shire SBC, on-site detention measures are contained within the Business Centre site developable areas of the site, clear of drainage lines and Open Space Precincts. l:\9000-9999\9200-9299\9279\code\03-03-22 water sensitive design code.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.