Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Civil Engineering Report

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 57, section 1. The text section number identifies this passage in the reader.

WATER SENSITIVE DESIGN CODE
Performance Criteria and Acceptable Solution
83 Butler Street, Tewantin
3 March 2022

              PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                     RESPONSE

                                                                   AO9.2                                                          RO9.2
                                                                    Planting densities result in a stable channel over the long   Not applicable – No open stormwater conveyance channels
                                                                    term and minimize potential for invasive weed growth.         are proposed to be constructed as part of the development.



PO10                                                               AO10                                                           RO10
Development design and operation facilitates nil increase in        Methods to prevent gross pollutants entering stormwater       Complies – Future residential developments on the new lots
gross pollutants entering stormwater systems.                       systems and waterways are adopted that—                       will incorporate ‘best management practice’ such as
                                                                                                                                  wherever possible, to minimise impacts and satisfy water
                                                                    a) are low maintenance;                                       quality requirements.

                                                                    b) prevent nutrient leaching in the event scheduled
                                                                    maintenance is delayed; and

                                                                    c) facilitate human behaviour change (e.g. signage, bins).




l:\9000-9999\9200-9299\9279\code\03-03-22 water sensitive design code.docx
                                                                                              Page 5
Log in to download the original file

Civil Engineering Report.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.