Original source · versioned page text
Civil Engineering Report
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
3 March 2022 1 PURPOSE This Civil Engineering Report has been prepared in support of the proposed one into five lot subdivision at 83 Butler Street, Tewantin. 2 INTRODUCTION 2.1 Project Description The current proposal involves the reconfiguration of a lot at 83 Butler Street, Tewantin. The development works will ensure the proposed lots are adequately serviced for site services including water, sewer and stormwater. The proposed lot layout is depicted on the subdivision proposal plan prepared by Focus on Surveying attached in Appendix 1 and below. Figure 1 – Proposed Development Excellence with Economy in Engineering 5 l:\9000-9999\9200-9299\9279\report\03-03-22 civil engineering report_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.