3.2 Topography and Existing Site Drainage
The site is currently occupied by a residential dwelling and ancillary structures. The site has a
moderate grass cover and contains a number of scattered trees.
The site generally falls from the south east to the north west from a high of RL8.80m AHD at the
south east site corner to a low of RL6.63m AHD at the north west site corner.
Stormwater runoff from the existing site sheet flows west across the site boundary into the
adjacent allotment and Ghostgum Court. The runoff also flows north east into the adjacent
allotment and Butler Street.
The site had a minor upstream catchment, from the adjacent property to the south, that sheet flows
over the southern boundary of the site.
There is an existing stormwater pit and easement in the south west corner of the site.
A copy of the survey plan prepared for the site prepared by Focus on Surveying is attached in
Appendix 2.
4 SITE DATA
Site data has been obtained from the following sources of information:
• Noosa Shire Council Interactive Mapping
• Noosa Shire Council (NSC)
• Unitywater Interactive Mapping
• Dial Before You Dig (DBYD)
• Discussions with relevant authorities
• Relevant reports
• Satellite imagery
• Survey plans
Excellence with Economy in Engineering 7
l:\9000-9999\9200-9299\9279\report\03-03-22 civil engineering report_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.