MAX WATTERSON+ASSOCIATES

CONSULTING SURVEYORS & PLANNERS

 

12" September, 2013
Ref: 06-2184
Your Ref: JLO13:JL:MCU12/0184
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
SUNSHINE COAST MAIL CENTRE Q 4560

Attention: Jack Lewis
Dear Sir,

Re: Development Application for Material Change of Use (MCU12/0184)
(Animal Husbandry Type 2) — Poultry Farm
Environmentally Relevant Activity (ERA12/0087)
Lot 21 on SP226606 — 136 Top Forestry Road, Ridgewood
Applicant: W Donald Milligan Pty Ltd.

| refer to the above-mentioned matter and your email containing an Outstanding Issues
Request dated 28" June, 2013; and | respectfully supply the following documents:

1) A Preliminary Operational Management Plan has been prepared by MWA
Environmental, (Job No. 12-002 dated 11" September, 2013). The Plan
addresses the integration of the poultry farm operation with the avocado orchard
operation. The Plan also includes correspondence prepared by Alwyn Peffer &
Company Pty Ltd regarding an audit of the tree count and nutrient calculations
prepared by Myriad International Pty Ltd which concludes that the composted
material produced will not meet the demands of the orchard.

2) An additional response prepared Hayes Traffic Engineering (dated 5 August,
2013) and an updated Traffic Engineering Report (Project 11347 — Version DA
RFIO2 dated August 2013) incorporating the additional response required by
Council.

3) An additional response prepared by MWA Environmental regarding Odour Issues
(dated 11" September, 2013) addressing the issue of odour generated by the
composting operation.

4) An amended Stormwater Treatment and Water Quality Management Plan
prepared by Callaghan & Toth - Civil, Hydraulic & Environmental Engineers (Ref:
No. 1209 SWQMP Report_Version_2 2013 dated August 2013). The amended
Management Plan includes additional bunded areas set aside for the compost
operation.

| also refer to additional issues raised by late submission lodged at Council; in particular
the multiple submissions by Mr Rod Ritchie and the submission by Cr Tony Wellington
(“More Chooky Business” dated 16" July, 2013).

Fruit Tree Audit

As stated above an audit of the tree count is included in the Preliminary Operational
Management Plan with a tree count of 6,651 avocado trees in the orchard engaged in
the current production of fruit.

PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max L. Watterson PH 07 5442 6121
Cadastral Surveyor (QId) FAX 07 5442 5125

B.Surv(UNSW). M.S.S.S.I EMAIL [email protected]
Log in to download the original file

2184scrcresponse2.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

Several additional areas are currently lying fallow following the removal of the mango
trees; these areas are terraced with irrigation in place and the intention is to bring these
areas into production. It is estimated that 3,000 additional trees will be planted in these
areas. The applicant has not commenced this planting due to the assessment of this
application. The areas lying fallow to be planted are shown on the attached aerial photo
of the site.

Traffic Concerns

The issues have been addressed in the Traffic Management Plan prepared by Hayes
Traffic Engineering. The report concludes that the traffic generated is significant and
proposed several Upgrade Works to Top Forestry Road to address safety issues.

Waste Management
The issues are addressed in the information supplied by Myriad International and the
Stormwater Treatment and Water Quality Management Plan.

The reports state the amount of compost produced will not be sufficient to supply the
current orchard of its fertiliser needs.

Water Quality

The Stormwater Treatment and Water Quality Management Plan concludes that the
production and use of the compost can be carried out without impact upon the water
quality of Blackfellow Creek or the Mary River.

It is noted that the Queensland State Government has recently (31S August, 2013) sold
land located adjacent to the Mary River for the development of a similar Poultry Farm.

Odour

The report prepared by MWA Environmental addresses the impact upon adjoining
properties with respect to the poultry operation and composting of the waste. The report
concludes that the impact upon the adjoining properties is below the required thresholds
and includes setback requirements to lessen any impacts. It is noted that the closet
residence to the poultry operation is approximately 850 metres.

Please note that this submission completes our response to your Information Request.

| thank you for your consideration in this matter.

Max Watterson

Page 3

 

 

 

Ee oa =
Zz «2 3 ° S alas
On 0 € oo a: 5 8 ® ©
nw a 3 |Z Oo ES 5 2 er

— ” g Lt oO c @ N
a = g Zz <x 9 S 8 r
wis 58 . |2 Euas ee |**] 8

a 2 | Zo
ge oZ ake | SouN - § 8
O 25 & esse [EF roa 9. 2G
= o agg uo @
=a 5 2 ass8 = a 20 uw o@2 6 «

A 3 @QO2-e a nt See 8a S
<a =z oxgS5S°e zie ES 3 = 8 z =
qi 0 225 5 2 gc rO Sead w Ee = wi

O sZogcsE # 4 wow 228 ® Ee
= -aoorng o > — —- a 6.8 oS g§ 2 265 5
5 c£octeren z£og998 6 8 6 8 z

 

 

 

 

 

 

OO}
Or
QR

<5
xs

aS

i

 

S

OO ?
OOOO?
SRLS
LEM OS
so

Se
YS

ZS

 

 

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.