Council archive · source document
07/2011 - MCU - Detached House [As Published] · 132007.2011
INTEGRATED PLANNING ACT 196/
State-controlled road matters
For more inforntution refer to Guida 3.
Untess you anewertd “nono of the abeve" fo 0
the appiication triggers tetcrrat ta the Deparlne
gt Main Roads (DMR} as 9 celerrat agency,
In cartain ci¢umstonces OMR wif be an cdvica
agency, while in olhay cxrcunstances ODMR wil
de A cOfcucence agency.
schedule 2 of the [P Regulation will assist you Io
determine whera DMR is afi advice of
concutterce anency for the application.
—-
Clearing vogetation
For mart: information fefer {o. Guide 12.
Uniess you answered’ ‘none of the above" to 03,
the epplicstion tequives assessment by the
Baines aL ial Rossa Nae
(NRW). ve
If an ogenty other, tha an sin. ls the absessinent
manager for the apptestion, N NRWiss'™ *
concurane ‘agoncy’ Kes ire petiefon | ity sean
fo this matter. fi %
If you ticked O31} Or {i (th, your spplation ragitres
tafarral lo NRW ler assessment rmgardiasy of
whether vagoiation clearing :proporedo of ‘ok
“es
oe
ad
Strategte port land
For mrp information rofar ta Guide 41.
H you fcked {i} - the selovanl Pont Authovity is Use
axsessmenl managar lar (he apptication.
it you ficked (s} Quoansiand Tiansporlis a
concurrence agency for the arplicaton.
—— a ¢ SY Se ESE 3 as
IDAS AssessmertChechlist, Version 20,2 April 2007
The application involves: (tick eppicanio boxes) "
[_] (i) development on land contiquows* to a State controlled road and to -
{_] {a} material change of use assessable against the planning scheme;
LJ (b) reconfiguring a fol unless -
- the total number of lots is nol increased; and
» the total number of lots abutting the State-contoted road is not increased;
(_] {c) operational work (nat essociaind with a material change of use assessable against the
planning scheme of reconfiguring a fot mentioned in (b) above}-
» associated with access to a Stale-cantrolled road; of
+ for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with @ cross-sectional area greater than 625 cm? that direcls stormwater toa
State-controlled road.
(1) (ti) development on land not centiguous to a State-controlled road and -
(1 (a) material change of use -
« assessable against the Iccal government's planning scheme; and
» mentioned in schedule 5 of the IP Regulation and exceeding the thresholds sel by
that schedule;
CL} (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and excecding the thresholds set by that schedule;
{]{¢} operational work {not associatod wilh a material change of ure assessable against the
planning scheme or reconfiguring @ lol mentioned in (b) abova}-
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedul,
MA (ii) none of the above
oF
The application involves: | (ick epplicabie t bax/es)
() (i) material change of use ~
(a) assessable against the planning scheme;
(b) on alot containing -
= acalegory 1, 2 or 3 area shown on a property map of assessable vegetation: or
« \fthere is No property map of assessable vegetatlan for the lot - remnant vegetation:
(c) where the existing use of the land is a rural or environmental yse, and
{d) where the size of the land is 2 hectares or targer -compicte Part J of Forni 1
reconfiguring a fat -
(a) on alotcontaining a category 1, 2 or 3 area shown on & property map of
assassable vegetation or, if there is no property map cf assessable vegetation for
the lot, romnant vegelation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger:
(c) where 2 of more lots are created: and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(J {ili} operational work -
(a) for the clearing of native vegetatlon where the vegetation cleating | is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i} or reconfiguring a lot mentioned In {ii} - complete Part J of
Form j
ee {iv} none of the above.
L (i)
ait fo) —! =
ae on ee 7 .
The application involves: :
[_} (i) development on strategic port land as defined in the Transport Inirastructure Act 1994 (T1
Act) «complete Part! of forat 1
[9 (i) a material change of use that is inconsistent with the land use plan approved under the
Tl Act for the strategic port land - complete Pad tof Farm |
(4 (iti) none of the above
4 Lend contigunn to a Slata-controlied dod is dnfinod in schadute 14 of the IT? Regulation to mena tend - iT part of the land is within 100rn of the State-conteled road; of thal f= past of a future State.
sontnlled turd.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2011 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.