Skip to the record
For the highest quality transcripts.

Council archive · source document

07/2011 - MCU - Detached House [As Published] · 132007.2011

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

 

Integration of land use and public
transport

For rave Iniotmation rete: lo Guida 23, schadyle
SA of tho (PA, & schedule 2 of tha IP Remytation.

Untess you answetcd "none of tha above™, thu
application Wiggers referral 6 QT as a
conculrance agoacy,

crete

IDAS Assessment Checilisl, Versivn 20,2 Apel 2007
22. The epelication involves: {tick ine appcable box/es)—

C (i) a material change of use assessable against the planning scheme for a purpose

mentioned in schedule 13C of the IP Regutalion and excecding the thresholds set by that
schedule.

() Gi) reconfiguring a fot—

("} {a} on land that js completely or partly within a public vansport corridor, and the
total aumber of lots increases;

(}{b) on land that is completely or partly within a future public transport carrier or
an airport's public safety area;

(}{c} on land thal is within 400m of a public passenger transport facilky or a future
public passenger transport facility, and the total site area is $000m? or greater.

[1(d} for a residential purpose within the 25 ANEF contour for an airport;

(_}(e)} fora residential purpose resulting in 100 or more allotments.

C) (iii) operational work assessable against the planning scheme, but not associated with a

material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(2) is completely or partly within a public transport corridor or a future public
transport corrldor;
("] (o) will result in work that encroaches into an airport's operational airspace.

(XJ {iv} none of the above,

 

 

Raliway safety i and Giiloncy.

For more intormation refer. to Guide 24, schedule
BA of the [PA- -Rschaauilé 2 of ths IP Regitation.
Unless you answered * none of the above’, tha

application triggers referral to'QT ag: a
concurrence agency.

 

—Ts a
SS ———— et

Moonie to Brishane plpcilne

Foy mora information mater to schedule 2uf the if
Rrquiatvon.

Uniess you afswarad “none of the above’, Ihe
applleation higgars retarnil to lie holder of
Hipotina ficcnce No $ issued undar he Pet oicum
Act 1923, curtently Santas QUT Ply Lid, tor
advice.

 

=,

 

—=1 ae
ros —=-o

 

on
". + i

23. The application invelves: (lick the apphcabia box/as}—

(-} {i) a materia! change of use assessable against the planning scheme for a purpose

mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

(_} {ii} reconfiguring a fot

C) {a} on land thatis completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(3) (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 000m? or
greater,

[J {c) on land that abuts rail corridor land, commercial corridor land er future raitway
land, and (he total number of lots Increases:

[] (d) on land that abuts rail corridor land, commercial corridor fand of future railway
land and an easement abutting the corridor or future railway land is created:

[-}{e} on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

LJ {) for aresidential purpose resulting in 100 or more allotments.

("] (ii) operational work assessable against the planning schome, but not associated with a

material change of use mentioned in (i) above or reconfiguring a lat mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m%, on land that~

[-}(a) is completely or partly within rail corridor land of Commercial corridor land, and
the work is not for rail transport infrastructure or ather rai infrastructure:

CJ {b) is completely or partly within futuro railway land, or a railway tunnel easement;

[4 {c} abuts rail corridor land, commercial corridor land or future railway lana, and

 

ths work is within 25m of the railway boundary.
(x) (iv) none of the above.

24. The application involves the ¢ easement for the construction or operation of the Moanie to
Brisbane strategic pipeline, and involves: {tick the applicable dox/es)—

(] (i) amaterial change of use assessable against the planning scheme and noi associated
with reconfiguring a tot, and any structure or work will be located wholly or partly in the
easement.

(1) (li) reconfiguring a lot

C1 Gil) operational work assessable against the planning scheme, thatis filing, excavation,
vompaction, drilling, boring or piling nat associated wilh a reconfiguring a lol, and the
work is located wholly or partly in the easement.

4 iv) none of the ahove.

 

 

“—™~ 1!  —

 

Paris fi

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2011 - MCU - Detached House [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.