Skip to the record
For the highest quality transcripts.

Council archive · source document

07/2011 - MCU - Detached House [As Published] · 132007.2011

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

 

Q3 e Asingle development application may invalve and both within and outside waters.

» A watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the paint to
which high spring tide ordinarily floes and reflows (unless a regulation has declared a limit for the watercourse). Generally, a watercourse
is in the jurisdiction of the Department of Natural Resources and Water.

‘Tidal water’ is defined in the Coastal! Protection Act 1995 (Schedute) and ‘tidal area’ for a Jocal government and for strategic port land is
defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in retation to high
water mark at spring tides) establishes the boundary of a tidal area.

» Land below high water mark is not within a local govemiment's area unfess provided for under the Local Government Act 1993. Unless
otherwise provided for by !egislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a focal
government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding appiications for prescribed tidal
works within the tidal area for a local government, and the planning scheme may be apolied to that assessment (to the exient provided
for in the code for prescribed tidal work}.

Q9 « The applicant need not be the owner of the land. However, the appticant is responsible for ensuring the information provided on the
Form 1 Application Farm (including this Part and any other relevant Part) is correct.

« Ifthe appticant is a company or organisation, a contact person must be nominated.

¢ Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

Q10 « Section 3.2.1{5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedute 10 of the integrated Planning Regulation 1998 (PR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Requtation

* Section 3.2.1(10)(a)({i) states an application cannot be taken to be properly made without the required evidence.

« Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark..

- nthe case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.

» Inthe case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or

encroachment {identified by gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referrat to
the Department of Main Roads.

O11 © Section 3.2.1(3) of the IPA prescribes that an application must contain, of be supperied by, the written consent of the land owner/s, if the
application involves any of the following:
(i) a material change of use;
{iijrecon figuration of a tot
(ii) work on land below high-water mark and not within a canal as defined under the Coasta/ Protection and Management Act 19985; or
(iv) work on rail corridor land defined under the Transport Infrastructure Act 1994.

¢ ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of !odging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

¢ Owner's consent is not required for a mobile and temporary ERA.

Qi2 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

Q13 » The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entittements to workers in the

building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To
fund the scheme, a levy is collected on all building and construction work cartied out in Queensland where the total cost of the work,
whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for calculating
the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount
collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction Industry Training Lewy.

+ The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction industry
for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing
buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

+ The PLSL Act requires the portable tong service leave levy {PLSL levy) be paid before the assessment manager may give a development

permit for certain Duilding or operational work. The assessment manager must sight an approved form issued by QLeave advising of the
Status of the payment of the levy.

 

 

 

 

 

Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request
from QLeave, or can be compteted on the QLeave website at wemw.gleave.ald.aov.au

e For further information contact QLeave (Tel: 1800 803 481 Web: waw.gleave.qid.cov.au )

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in accordance
with the pracessing and assessment of your Application. Your personal details will not be disclosed for a purpos e outside of the IDAS
process, except where required by legislation (including the Freedom of Information Act 1992) or as required by Parliament. This
information may be stored in a Department of Loca! Government, Planning, Sport and Recreation database. The information collected will
ba retained as required by the Public Records Act 2002. For further information on your privacy, contact the Privacy Contact Officer for
the Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.

-§ -

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2011 - MCU - Detached House [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.