Original source · versioned page text
Response to Information Request MCU16/0117 & OPW16/0212
PROPERTY BOUNDARY PUA . 3 % Pavenjent crossfall Existing open drain 250 wide x 300 dee EXISTING PAVEMENT WIDTH | concrete edge to vad 300 CUTBACK N32 concrete OF EXISTING AC PAVEMENT 4 Se Footpath to be grade we [te match existing nd. i > a <= a 200 MM Zz =) oO a 25mm A.C. SURFACING > 100mm BASE COURSE GRAVEL (TYPE 2.2) - 150mm SUB BASE COURSE GRAVEL (TYPE 2.4) WW oO a a TYPICAL PAVEMENT WIDENING CROSS SECTION Project 11 OPAL STREET, COOROY Comments Rainfall Calculations Total Site Area 1536 sqm Limiting runoff from Site (Dia 450) 999 m3/sec (999 voids this check) ARR Intensity Calculation Data - As obtained from BOM IFD program Pavement area to Detention Tank 0 sqm Input Data Storage in bio-retention basins 0 cbm Duration Roof Area into Detention Tank 300 sqm ARI thr [12 hr [72 hr Site Area 1536 sqm 2 49.7 10.5 3.44 Travel length 50 m 50 94 25.8 9.13 Site Slope 0.01 Surface Roughness 0.013 iSkewness 0.13} Map 7 Land Description L L/M/D Geographical Factor (F2) 4.39] Map 8& Soil Permeability L High/Medium/Low (H/M/L) (Geographical Factor (F50) 17.57| Map 9 L ==> Light cover bushland, or poor grass cover, or low density pasture, or low cover bare fallows M-==> Medium Density Bush, or good grass cover, or high density pasture, or zero tilling cropping H==> Dense Bushland Un-Developed Fraction Impervious 0.45 From Fig. 4.05.1 in QUDM (2007) Developed Fraction Impervious 0.85 From Fig. 4.05.1 in QUDM (2007) One Hr rainfall Intensity for Q10 70.99084 mm/hr Calculated Travel Time 3 Min Must equal time selected for intensity Adopted Storm Time 3 min Detention Tank Provided 4000 It Return interval (ARI) 2 5 10 20 50 100 Intensity (for Return Interval) 122.13 156.17 195.69 218.86 250.48 292.27 324.42 | I I ] I I C10 value 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 Fy Factor 0.800 0.800 0.850 0.850 0.950 0.950 1.000 1.000 1.050 1.050 1.150 1.150 1.200 1.200 Cy 0.632 0.696 0.672 0.740 0.751 0.827 0.790 0.870 0.830 0.914 0.909 1.001 0.948 1.044 Q (m3/sec) 0.033 0.036 0.045 0.049 0.063 0.069 0.074 0.081 0.089 0.098 0.113 0.125 0.131 0.145 Total Rainfall for event (m3) 9 13 15 18 23 27 Total Non-Worsening Volume for Storm (m3) 1 2 2 2 3 3 Roof Area Runoff for Storm (m3) 1 2 2 3 4 5 LINDSAY CONSULTING 2 CLA OFF, 20/82 PA THIS DRAWING REMAIN HE PROPERTY OF LINDSAY CONSULTING PTY LTD AND IS FOR THE SOLE USE OF THE CLIENT. NO PART MAY BE USED IN PART OR WHOLE WITHOUT PRIOR EXPRESS WRITTEN CONSENT OF LINDSAY CONSULTING PTY LTD CLIENT AND PROJECT DESCRIPTION T ROSSITER & S MURPHY PROPOSED RESIDENCES LOT 1 (SP248165) OPAL ST COOROY DRAWING TITLE CIVIL WORKS FRONTAGE WORKS SCALES SURVEY DATUM ASSOCIATED CONSULTANTS REVISION LIST > ORIGINAL ISSUE 15/9/2016 ‘AMENDED OV 12/16 fompuler Flle 160604FP.DWG DRAWING NUMBER ‘SHEET | REV. 16-0604-C2 2|B
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Response to Information Request MCU16_0117 & OPW16_0212.msg)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.