CONSTRUCTION MANAGEMENT PLAN

 

LINDSAY CONSULTING 17
CLI

    

REO 4928.

 

 

CONSTRUCTION MANAGEMENT PLAN DIARY

 

 

Weekly Visual Inspection or After Rainfall Event

 

LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF

LINDSAY CONSULTING PTY LTD

 

 

 

 

 

 

 

CLIENT AND PROJECT DESCRIPTION
T ROSSITER & S MURPHY
PROPOSED RESIDENCES

LOT 1 (SP248165) OPAL ST
COOROY

 

Project:- Operational Works — PROPOSED RESIDENCES

Principal:- T ROSSITER & S MURPHY

Contractor:—

Location:— LOT 1 (SP248165) OPAL ST, COOROY

Job Ref. No: 160604 Council File Ref. No.
Date:- [1 Regular Monitoring (Weekly)

Approx Time:~ am/pm [1 Special Event Monitoring (briefly describe event)

 

 

 

 

 

DRAWING TITLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Performance trem Performance Indicator
Indicators
1. Vegetation No disturbance of soil below retained vegetation due to construction activities.
2. Hours of Work No work conducted outside specified hours without satisfactory evidence of measures
taken to suppress noise and other emissions / dust.
3. Lighting No resident's complaints regarding construction security lighting.
P garding y lighting
4. Existing Roads No abutting public roads contain soil, gravel, clay or other such materials originating
from onsite construction activities.
5. Signage No observed or reported incidents due to inadequacy or obsence of signage or other
control mensures.
6. Waste Control No complaints from local residents and site is kept tidy at all time
No occurrence of illegal dumping onsite and all materials where possible have been
7. Waste Minimisation
appropriately recycled.
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
10. Traffic Management No works ore carried out without implementation of the approved Traffic Management
Plan.
11. Existing Infrastructure No unplanned damage to existing utilities and infrastructure.
12. Non Conformances All non confermances have been reported ond rectified
The site foreman is to monitor the performance of all construction activities and any departure from the Construction
Monitoring Management Plan control measures is to be immediately rectified.
Responsible The site foreman is to be responsible for all inspections and maintenance of the Construction Management Plan.
Person
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for sediment
control) on a weekly basis os a minimum, but also after every significant rainfall event (which causes site runoff) or
other special event affecting the site or any watercourses traversing the site. The Construction Management Plan Diary
Reporting lin conjunction with the Environmental Diary) shall be completed and delivered to the Superintendent for record and audit
purposes with each progress claim for the construction works.
Corrective The site foreman is to arrange all corrective actions, controls and rectification activities, and report on all measures
Actions

 

taken in the Construction Management Plan Diary.

 

 

 

 

bote control Condition Corrective Action Corrective Action Taken
Item Monitored eons Acceptable Required CONSTRUCTION MANAGEMENT
Measure Installed quire (Describe)
v U
Retained Vegetation
SCALES
Air Emissions
ve 0 2 & 6 8m
| l ! l J
Security Lighting Orig 1:200
Vibrations
SURVEY DATUM
Existing Utilities, Roads & Drainage Infrastructure
Construction Traffic &@ Parking ASSOCIATED CONSULTANTS
Waste Minimisation & Recycling
Erosion & Sedimentation Control (Environmental Diary!
Other
Item Monitored
Any Special Comments:-
REVISION LIST
‘A [ORIGINAL ISSUE 1579/2016
Signed:- B_[ AMENDED 01712716

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{Computer File
160604FP.DWG

 

DRAWING NUMBER SHEET] REV.

16-0604-C6 6/B

 

 

 

 

 

 

Log in to download the original (Response to Information Request MCU16_0117 & OPW16_0212.msg)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.