Response to Information Request MCU16/0117 & OPW16/0212
CONSTRUCTION MANAGEMENT PLAN
LINDSAY CONSULTING 17
CLI
REO 4928.
CONSTRUCTION MANAGEMENT PLAN DIARY
Weekly Visual Inspection or After Rainfall Event
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
CLIENT AND PROJECT DESCRIPTION
T ROSSITER & S MURPHY
PROPOSED RESIDENCES
LOT 1 (SP248165) OPAL ST
COOROY
Project:- Operational Works — PROPOSED RESIDENCES
Principal:- T ROSSITER & S MURPHY
Contractor:—
Location:— LOT 1 (SP248165) OPAL ST, COOROY
Job Ref. No: 160604 Council File Ref. No.
Date:- [1 Regular Monitoring (Weekly)
Approx Time:~ am/pm [1 Special Event Monitoring (briefly describe event)
DRAWING TITLE
Performance trem Performance Indicator
Indicators
1. Vegetation No disturbance of soil below retained vegetation due to construction activities.
2. Hours of Work No work conducted outside specified hours without satisfactory evidence of measures
taken to suppress noise and other emissions / dust.
3. Lighting No resident's complaints regarding construction security lighting.
P garding y lighting
4. Existing Roads No abutting public roads contain soil, gravel, clay or other such materials originating
from onsite construction activities.
5. Signage No observed or reported incidents due to inadequacy or obsence of signage or other
control mensures.
6. Waste Control No complaints from local residents and site is kept tidy at all time
No occurrence of illegal dumping onsite and all materials where possible have been
7. Waste Minimisation
appropriately recycled.
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
10. Traffic Management No works ore carried out without implementation of the approved Traffic Management
Plan.
11. Existing Infrastructure No unplanned damage to existing utilities and infrastructure.
12. Non Conformances All non confermances have been reported ond rectified
The site foreman is to monitor the performance of all construction activities and any departure from the Construction
Monitoring Management Plan control measures is to be immediately rectified.
Responsible The site foreman is to be responsible for all inspections and maintenance of the Construction Management Plan.
Person
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for sediment
control) on a weekly basis os a minimum, but also after every significant rainfall event (which causes site runoff) or
other special event affecting the site or any watercourses traversing the site. The Construction Management Plan Diary
Reporting lin conjunction with the Environmental Diary) shall be completed and delivered to the Superintendent for record and audit
purposes with each progress claim for the construction works.
Corrective The site foreman is to arrange all corrective actions, controls and rectification activities, and report on all measures
Actions
taken in the Construction Management Plan Diary.
bote control Condition Corrective Action Corrective Action Taken
Item Monitored eons Acceptable Required CONSTRUCTION MANAGEMENT
Measure Installed quire (Describe)
v U
Retained Vegetation
SCALES
Air Emissions
ve 0 2 & 6 8m
| l ! l J
Security Lighting Orig 1:200
Vibrations
SURVEY DATUM
Existing Utilities, Roads & Drainage Infrastructure
Construction Traffic &@ Parking ASSOCIATED CONSULTANTS
Waste Minimisation & Recycling
Erosion & Sedimentation Control (Environmental Diary!
Other
Item Monitored
Any Special Comments:-
REVISION LIST
‘A [ORIGINAL ISSUE 1579/2016
Signed:- B_[ AMENDED 01712716
{Computer File
160604FP.DWG
DRAWING NUMBER SHEET] REV.
16-0604-C6 6/B
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Response to Information Request MCU16_0117 & OPW16_0212.msg)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.