18. Wastewater and sullage must only be disposed of at approved pumpout facilities.
19. The mooring facility must not be utilised for live-aboard purposes.
20. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
21. Certification by a Registered Professional Engineer of Queensland that states that the jetty
is constructed in accordance with best practice methods and is structurally sound must be
submitted to Council. This certification must be submitted to Council within three (3) months
of the completion of the works. A final inspection and approval of the structure by Council’s
Inspector is also required. Please contact Council’s Development Assessment Branch on
5329 6500 to arrange the inspection.
22. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
23. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Address Referral Trigger Response
Concurrence SARA at DILGP SARA at Planning Regulation The agency provided
DILGP Via MyDAS2 at 2017 its response on 30
https://prod2.dev- Schedule 10, Part April 2025
assess.qld.gov.au/suite/ (for 17, Division 1 - Tidal (Reference No. 2504-
assistance, contact DILGP at Works or work in a 45768 SRA).
5352 9701 or Coastal A copy of the
email:SEQNorthSARA@dilgp Management District response is attached
.qld.gov.au [Insert trigger title]
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. The approval or conditions do not absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
statues and/or statutory regulations in the execution and/or performance of said works.
3. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
Page 7 of 8
Document Set ID: 23725501
Version: 4, Version Date: 19/05/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0038 & OPW25 0056 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 457 KB (small file)
- File type
No other editions are linked here.