Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
(c) subject to paragraph (d), a boardwalk or independent deck that is
not accessible to vehicular traffic and that is for group use is able to
support at least a live load of 3.0kPa;
(d) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a), (b) or (c)—the relevant
planning scheme standard, to the extent it is more stringent
than the standard mentioned in paragraph (a), (b) or (c).
15.2 Prescribed tidal work that is a boardwalk or an (s 6(2) solution) N/A
independent deck and for a non-private purpose is The design or construction of the boardwalk or deck is consistent with
designed and constructed in a way to ensure it is able to the following standards—
support its intended loads, having regard to its relevant (a) subject to paragraph (c), a boardwalk or independent deck
loading matters. accessible to vehicular traffic is able to support at least the following—
(i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 4.5kN;
(iii) the load of the largest vehicle capable of being on the boardwalk
or deck;
(b) subject to paragraph (c), a boardwalk or independent deck not
accessible to vehicular traffic is able to support at least the following—
(i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 4.5kN;
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent it is more stringent than the standard
mentioned in paragraph (a) or (b).
15.3 Prescribed tidal work that is a boardwalk or an The design and construction of the boardwalk or deck is consistent N/A
independent deck does not prevent or hinder with the following standards—
remedial work being undertaken on any bank of tidal (a) subject to paragraph (b), a boardwalk or independent deck either—
water or for any existing retaining wall, revetment or (i) can be easily dismantled and reassembled; or
seawall or another existing structure. (ii) does not restrict the movement of machinery ordinarily used for
remedial work to any bank of tidal water or any existing retaining wall,
revetment or seawall or other existing structure;
(b) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme standard, to the extent it is more
stringent than the standard mentioned in paragraph (a).
Design, construction and safety—jetties and piers
16.1 Prescribed tidal work that is a jetty or pier and for a (s 6(2) solution) N/A
private purpose is designed and constructed in a way to The design and construction of the jetty or pier is consistent with the
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.