IDAS Code responses · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_____________________________________________________________________________________________________________Callaghan and Toth Pty Ltd
20.1 Prescribed tidal work that is a wharf is designed (s 6(2) solution) N/A
and constructed in a way to ensure it is able to support The design and construction of the wharf is consistent with the
its intended loads, having regard to its relevant loading following standards—
matters (a) subject to paragraph (c), a major wharf, or a minor wharf accessible
to vehicular traffic, is able to support at least the following—
(i) a distributed live load of 5.0kPa;
(ii) a concentrated live load of 13kN; or
(b) subject to paragraph (c), a minor wharf not accessible to vehicular
traffic is able to support at least the following—
(i) a distributed live load of 5.0kPa; or
(ii) a concentrated live load of 4.5kN; or
(c) if a relevant planning scheme standard is more stringent than the
standard mentioned in paragraph (a) or (b)—the relevant planning
scheme standard, to the extent it is more stringent than the standard
mentioned in paragraph (a) or (b).
IDAS Code Responses_Rising Main Works_MossmanCourttoSerenityClose pg. 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS Code responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 388 KB (small file)
- File type
No other editions are linked here.