Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2499 - 33 Pavilion St, Pomona - Revised Civil Drawings_Optimized

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

                                                                                                          NOTE:
                                                                                                          REFER TO IECA STANDARD DRAWINGS FOR NOTES AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SEDIMENT & EROSION CONTROL
                                                                                                          CONSTRUCTION DETAILS.                                                                                                                                                                                                                                                                                                                                                                                                                                        NOTES
                                                                                                                                                                                                                                             SANDBAGS OVERLAP                                                                                                                                                                                                                                                                                                          SE1.    GENERAL:
                                                                                                                                                                                                                                             ONTO KERB                                                                                                                                                                                                                                                              FLOW CONTROL BERM INCORPORATED INTO                            a. TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE DIVERTED AROUND
                                                                                                                                                                                                                                                                                          4.0 m (min)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    THE ROCK PAD IF THE PAD RECEIVES                                    THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         MINIMU                                                     RUNOFF FROM THE BUILDING SITE                                  b.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND
                                                                                                                                                                                                                                       Sediment                                                                                                                                                     40 − 75 mm                                                 M LENG                                               (LOCATION MAY VARY)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     TH 10 m                                                                                                            BE OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.
                                                                                                                                                                                                                                                                                                                                                                                                    CRUSHED ROCK                                                                (MIN)
                                                                                                                  1.5m STAR PICKETS AT                                                                                                 pond
                                                                                                                  MAX. 2.0 m CENTRES
                                                                                                                                                                     SELF-SUPPORTING                                                                                                                                                                                                                                                          300 mm (min)                                                                                                                         c.   ALL SEDIMENT & EROSION CONTROL DEVICES MUST BE REGULARLY
                                                                                                                                                                     GEOTEXTILE                                                                                                                                                                                                                                                                                                                                                                                                         INSPECTED AND MAINTAINED BY THE CONTRACTOR. INSPECTIONS SHOULD




                                                                                                                                                                                                                                                                                                      1M
                                                                                                                             500 MM TO 600 MM                           DIRECTION OF                                                                                                                                                                                                                                   150 − 200 mm                                                                                                                                                     OCCUR ON A WEEKLY BASIS (MINIMUM), ALONG WITH BEFORE AND AFTER




                                                                                                                                                                                                                                                                                                          (M
                                                                                                                                                                        FLOW                                                                                                                                                                                                                                                                                                                                                                                                            SIGNIFICANT RUNOFF PRODUCING STORMS.




                                                                                                                                                                                                                                                                                                            AX
                                                                                                                                                                                                                                   Run-off                                   SPILLWAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ry                                             KERB




                                                                                                                                                                                                                                                                                                               )
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       da                                                                          d. ALL DISTURBED LAND MUST BE RENDERED EROSION-PROOF BY THE




                                                                                                                                                                                                                                                                                                                ON
                                                                                                                               600 MM MIN.             ON SOIL, 150 MM X 100 MM TRENCH                                                                                                                                                                                                                                                                        Width 2.0 m (min)                    n
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ou




                                                                                                                                                                                                                                                                                                                   PU
                                                                                                                                                       WITH COMPACTED BACKFILL AND ON                                                                                                                                                                                                                                                                                                      yb                                                                                           ESTABLISHMENT OF 80% EFFECTIVE GROUND COVER WITHIN 28 DAYS OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ert




                                                                                                                                                                                                                                                                                                                     BL
                                                                                                                                                       ROCK, SET INTO SURFACE CONCRETE                                                                                                                                                                                                                                                                                                                                                                                                  FINAL EARTHWORKS TRIM.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  rop




                                                                                                                                                                                                                                                                                                                        IC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                P                            Footpath
                                                                                                                                              SECTION DETAIL                                                                                                                                                                                                                                      UP-SLOPE RUNOFF




                                                                                                                                                                                                                                                                                                                           RD
                                                                                                                                                                                                                                                                                                                                                                       ON GRADE KERB INLET                                                                                                                                                                                         e. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED
                                                                                                                                                                                                                                                                                BYPASS FLOW                                                                            SEDIMENT TRAP IN           DIRECTED TO AN
                                                                                                                                                                                                                                                                                                                                                                                                  APPROPRIATE                                                                                                                            Roadway                                        SURFACES TO BE EITHER MULCHED, COVERED WITH EROSION CONTROL
                                                                                                                                                                                                                                                                                                                                                                       ACCORDANCE WITH IECA STD
                                                                                                                                                                                                                                                                       THREE LAYERS OF SANDBAGS                                                                        OG-01                      SEDIMENT TRAP                                                                                                                                                                         BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED FOR
                                                                                                                                                                                                                                                                       WITH ENDS OVERLAPPED.                                                                                                                                                                     MAKE SAFE FOR                                                                                                          MORE THAN 14 DAYS.
                                                                                                                                                                                                                                                                                                                                                                                                                    GEOTEXTILE FILTER CLOTH                      PEDESTRIAN TRAFFIC                                                                                                f.   STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION WHICH
                                                                                                                                                                                                                                                                                                                                                                                                                    (MANDATORY WHEN WORKING
                                                                                                                                                                                                                                                     ON GRADE KERB INLET SEDIMENT TRAP                                                                                                                              ON CLAYEY SOILS)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        GENERALLY SHOULD NOT BE USED IF OTHER OPTIONS ARE AVAILABLE.
                                                                                                                              DISTURBED AREA
                                                                                                                                           DIRECTION OF
                                                                                                                                                        1.5 M STAR PICKETS AT                                                                                                                                                                                                                                            TEMPORARY CONSTRUCTION ENTRY / EXIT                                                                                                           SE2.    SEDIMENT CONTROL FENCE:
                                                                                                                                               FLOW
                                                                                                                                                        MAX. 2.0 m CENTRES                                                                                                                                                                                                                                                NOT TO SCALE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   g. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                                                                                                                                                                                                          ROCK PAD FOR BUILDING SITES REFER TO IECA STD Exit -03                                                                                                   h. NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       AREA 0.6 HA PER 100M LENGTH OF FENCE.
                                                                                                                                                                                                                                                                        SPACING VARIES WITH SLOPE                                                4 m (min)
                                                                                                                                                                                                                                                                                                                                                                                 SIDE-ENTRY                                                                                                                                                                                        i.  WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON
                                                                                                                           UNDISTURBED AREA                                                      *   IF FENCE LOCATED ALONG THE                                                                                                          WHEREVER PRACTICAL                      INLET                                                                                                                                                                                                 SMALL WORK SITES, I.E. OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON
                                                                                                                                                                                                     CONTOUR, OTHERWISE 5-10m
                                                                                                                                                                                                     DEPENDS ON SLOPE                              VERGE                                  SEDIMENT                                                                                       GRATE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS NOT EXPECTED.
                                                                                                                                                                       20 M MAX.*                                                                                                                                                                                                                                                                                                                                                                                                  j.  WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR - REFER
                                                                                                                                                                          RWISE ON SWMP
                                                                                                                                                                                        /ESCP)                                                                                                                                                                                                                                  GEOTEXTILE FABRIC TO BE
                                                                                                                                            (UNLES          S STATED OTHE                                                                                                                                                                                                                                                                                                        TEMPORARY TURF STRIP                                                                                  IPEAW STANDARD DRAWING D-0040 FOR DETAILS.
                                                                                                                                                                                        FLOW                                                                                     OVERFLOW                                                                                                                                       WRAPPED OVER GRATE AND                                                                                                                             k. FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL BATTERS, WHERE
                                                                                                                                                                                                                                                                                                                                                                       ON-GRADE KERB INLET                                      SECURED UNDER AS SHOWN                           SURROUND (400mm MIN' WIDTH) -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       NOT PRACTICAL ONE FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1M
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 IN LANDSCAPE AREAS                                                                                    MIN AWAY. FENCE SHOULD NOT BE LOCATED PARALLEL WITH TOE IF
                                                                                                                                                                                                                                                                                                                                                ROADWAY
                                                                                                                                 MIN. 1.5 M
                                                                                                                                                                       STAR PICKETS AT MAXIMUM 2.0 m                                                                                                                                                                                                                                                                                                                                                                                   CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.
                                                                                                                                                                       SPACINGS
                                                                                                                                                                                                                                                                SANDBAG SEDIMENT TRAP                                                                                                                                                                                                                        FSL
                                                                                                                              SEDIMENT FENCE                                                                                                                                                                                                                                                                                                                                                                                                                           SE3.    TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP:
                                                                                                                                N.T.S.                                                                                                                                                                                                                                                                                                                                                                                                                                             l. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.
                                                                                                                                                                                                                                                TYPICAL LAYOUT OF ON - GRADE KERB INLET SEDIMENT TRAP                                                                                                                                                                                                                                                                              m. WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ALLOTMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                             PIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SE4.  SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE                TRAFFIC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       CONTROL DEVICES .

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SE5.   IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL         SEDIMENT
                                                                                                                                                                                                                 SAG KERB INLET SEDIMENT TRAP                                                                                                                        150 TO 300mm NOMINAL DIAMETER HARD,
                                                                                                                                                                                                                 IN ACCORDANCE WITH IECA STD                                                                                                                         EROSION RESISTANT ROCK.
                                                                                                                                                                                                                                                                                                                                                                                                                    ALLOTMENT PIT INLET PROTECTION                                                                                                                     AND EROSION CONTROL MEASURES HAVE BEEN                ADDRESSED AS STIPULATED IN
                                                                                                                                                                                                                 SA-01                                                                                                                                                                                                           NTS                                                                                                                                   THE ENVIRONMENTAL MANAGEMENT        PLAN. ADDITIONAL OR DIFFERENT SEDIMENT &
                                                                                                                                                                                                                                                                                                                                                                     SMALLER ROCK MAY BE USED IF SUITABLE                                                                                                                                                              EROSION CONTROL         DEVICES MAY BE REQUIRED DURING CONSTRUCTION PHASE TO
                                                                                                                                            FILTER SOCKS MAY NEED TO FULLY SURROUND
                                                                                                                                            THE INLET TO INTERCEPT SEDIMENT RUNOFF
                                                                                                                                                                                                                                                                                                                                                                     LARGE ROCK IS NOT AVAILABLE.                                                                                                                                                                                   COMPLY WITH THE ABOVE.
                                                                                                                                            FROM THE ROAD AND VERGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SE6.   TEMPORARY STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND     BE SHAPED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE      SATISFACTION OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SUPERINTENDENT. ALL EXPOSED STOCKPILE    SURFACES TO BE GRASS SEEDED. SEDIMENT
                                                                                                                       TYPICAL LIP-IN-LINE SAG INLET
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FENCES AND CUT-OFF      DRAINS MAY BE REQUIRED.
                                                                                                                                                                                 REEK
                                                                                                                                                                            TO C
                                                                                                                                                                       WS                                                                                                                                            FLOW                                                           FLOW
                                                                                                                                                                   FLO

                                                                                                                                                            -
                                                                                                                                                       TE                                            SIDE INLET REMAINS OPEN
                                                                                                                                                    WAS
                                                                                                                                             P NO
                                                                                                                                         DUM
                                                                                                                                                                                                                                                                                                                             'U' SHAPED CHECK DAM                                                                     SPACING FOR CHECK DAMS                           PHASING OF WORKS                                                                                                    SEDIMENT & EROSION
                                                                                                                                                                                                     GULLY GRATE WRAPPED IN
                                                                                                                                                                                                     NON-WOVEN FILTER FABRIC                                                                                                                                  PLAN                                                      ROAD       SPACING                            1. Establish construction site;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      2. Demolish & recycle existing buildings & driveways;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           CONTROL PROGRAM
                                                                                                                                                                                                     (MINIMUM, BIDIM A34 OR                                                                                                                                                                                             GRADE (%) (m)                                 3. Set up ESC measures;
                                                                                                                                                                                                     EQUIVALENT)                                                                                                                                                                                                        2           50                                4. Earthworks;                                                                                      OBJECTIVE/TARGET      THE CONTRACTOR MUST COMPLY WITH ALL STATUTORY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      5. Initial building works & reconnect site drainage;                                                                      REGULATIONS AND MAINTAIN THEM DURING EARTHWORKS/
                                                                                                                                                                                                                                                                                                                                                                         OPTIONAL GEOTEXTILE                            5           20                                6. Demolish & reconstruct driveway & verge. Connect all services to site, remove grid & fill                              CONSTRUCTION. ALL PROVISIONS AND SPECIFICATIONS
                                                                                                                                                                PROVIDE SAND FILLED 100Ø SLOTTED AG DRAIN, WRAPPED IN                                                                                                                                     1              SPLASH PAD PLACED BELOW                        10          10                                in sump;                                                                                                                  OUTLINED WITH THE APPROVED ENVIRONMENTAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      7. Cover all remainder earth areas with turf or concrete blinding layer if turf will damage;                              MANAGEMENT PLAN MUST BE ADHERED TO, ALONG WITH
                                                                                                                                                                GEOFABRIC, or APPROVED EQUIVALENT,                                                                                                                                                                       DAM TO REDUCE EROSION AT                       15          7                                 8. Continue & complete building works. Establish permanent, non-erodible ground cover;                                    ALL EROSION AND SEDIMENT CONTROL MEASURES
                                                                                                                                                                TO FRONT OF CHAMBER                                                                                                                                                                                                                                     20          5                                 9. Remove kerb inlet protection & sediment fence when site erosion is no longer an issue.                                 PRESCRIBED WITHIN THESE DRAWINGS BY THE
                                                                                                                                                                                                                                                                                                                                                                         THE BASE OF THE CHECK DAM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SITE ENGINEER
                                                                                                                                                                                                                                                                                                                                                                         (GENERALLY NOT REQUIRED)                                                                      ESC MEASURES:
                                                                                                                                 SAG KERB INLET SEDIMENT TRAP                                                                                                                                                                                                                                                                                                                                                                                                             MANAGEMENT            THE SITE FOREMAN IS TO IDENTIFY AND CHECK THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Access: Cattle grid installed in existing driveway slightly raised. Cut in 300mm deep sump          STRATEGY              DIRECTION OF STORMWATER FLOWS AS SHOWN ON PLAN.
                                                                                                                                                                                           NTS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      under for collection of sediment.                                                                                         PROVIDE BARRIERS AND OTHER MEASURES SHOWN ON
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Fence: Install geofabric sediment fence to downstream (front boundary). Anchor bottom of                                  PLAN TO PREVENT STORMWATER FLOWS OVER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      fence mesh against lifting.                                                                                               EMBANKMENTS, AND SEDIMENT INTO GULLY PITS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Drainage: Install filter socks and geofabric mesh around kerb inlets. Temporarily cap or seal
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      any drainage pipes and field inlets on site.                                                        TASKS / ACTIONS       ERECT SEDIMENTATION BARRIERS AS DETAILED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Street: Carry out regular street sweeping during earthworks and initial building works                                    STRATEGICALLY PLACE CHECK DAMS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      phases, when there is higher risk of sediment being tracked onto Street/Road.                                             AROUND GULLY PITS
                                                                                                                           1000 mm                                            TYPICAL 50 X 100 mm                                                                                                                                                         1                                                                                                           Contractor to arrange street sweeping when necessary
                                                                                                                           (max)                                              TIMBER CROSS MEMBERS                                                                                                                                                                                                                                                                                                                                                                        PERFORMANCE           THE SITE FOREMAN IS TO CHECK FOR EROSION AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ESC MAINTENANCE                                                                                    INDICATORS            SEDIMENT FLOWS AT THE BASE OF EMBANKMENTS AFTER
                                                                                                                                                                                                                                                                A                       150 mm (min)                                                 A                                                                                                                Access: Check grid sump every second day & after rain events for sediment build-up.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SIGNIFICANT RAINFALL AND SHOULD ASCERTAIN THE
p:\2499-33 pavillion st pomona\design\civil\acad [opw]\c510 erosion & sediment control details.dwg




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                WORKING EFFECTIVENESS OF CHECK DAMS DURING
                                                                                                                                                                                                                                                                                                                                                                           OUTER WING POINTS A TO BE                                                                  Vacuum excavate if full.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                THIS WET WEATHER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Fence: Check installation of fence daily & before all rainfall events. Particularly around the
                                                                                                           SEDIMENT                                                                                                                                                                                  B                                                                     AT LEAST 150 MM ABOVE                                                                      base and for adequate embedment of posts.
                                                                                                           FENCE                                                                                                                                                                                                                                                           CREST LEVEL B                                                                              Drainage: Check filter measures around kerb inlet daily & before rainfall events, as with           FREQUENCY /           SITE FOREMAN TO MONITOR PERFORMANCE AFTER
                                                                                                           FABRIC                                                                                                                                                                                                                                                                                            NOTE:                                                    fence.                                                                                              DEADLINE              EVERY HEAVY DOWNFALL
                                                                                                                                                                                                 300 mm                                                                                                                                                                                                      CHECK DAM CATCHMENT AREA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          RESPONSIBILITY        THE SITE FOREMAN IS RESPONSIBLE FOR ALL INSPECTIONS
                                                                                                                                                                                                 (min)                                                                                                                                                                                                       LIMITED TO 4.00 Ha. DEVICE IS                             WATER QUALITY
                                                                                                                                                                                                                                                                                                                                                                                                             INTENDED FOR VELOCITY                                    CONSTRUCTION PHASE RUNOFF SHALL EITHER BE:                                                          REPORTING REVIEW      SITE WORKMEN ARE TO ADVISE THE FOREMAN IF ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       1.      COLLECTED IN THE BASEMENT EXCAVATION AND REMOVED FROM SITE                                                       SEDIMENT & EROSION CONTROL DEVICES ARE FAILING
                                                                                                                                                                                                 FABRIC BURIED                                                                                                                                                                                               CONTROL ONLY - SEDIMENT
                                                                                                                                                                                                 200mm                                                                                                                                                                                                                                                                         VIA VACUUM TRUCK AND DISPOSED OF IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                         SECTION 1-1                                                                                                         COLLECTION IS A SECONDARY                                         TRUCK OPERATORS ENVIRONMENTAL POLICY, BCC REQUIREMETNS AND                                 CORRECTIVE ACTIONS    THE SITE FOREMAN IS TO REPORT AND ORDER THROUGH
                                                                                                                                                                                                                                                                                                                                                                                                             PURPOSE.                                                          EPA GUIDELINES.                                                                                                  SUPERVISOR, EXTRA BARRIER OR CHECK DAMS AS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       2.      DISCHARGED TO THE STORMWATER SYSTEM PROVIDED THAT THE                                                            REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               WATER IS TREATED TO THE BELOW REQUIREMETNS (IN ACCORDANCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               WITH THE EPA) AND TESTED TO CONFIRM PRIOR TO DISCHARGE:
                                                                                                                 FABRIC DROP INLET PROTECTION                                                                                                                                                                 ROCK CHECK DAM                                                                                                                                              2.1.      <50mg/L TSS
                                                                                                                 WITH SPILL-THROUGH WEIR                                                                                                                                                                                                                                                                                                                                  2.2.      pH BETWEEN 6.5 AND 8.5

                                                                                                                                                    NOT TO SCALE
                                                                                                                                                                                                                                                                                                                                            NTS
                                                                                                                                                                                                                                                                                                            CHECK DAMS - REFER TO IECA STD RCD -01
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          2.3.      NTU LESS <10% ABOVE BACKGROUND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CONCEPT ONLY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   PROJECT:                                                                                                                      JOB NUMBER
                                                                                                     REV DATE DESCRIPTION                                                                             BY         CHKD             DETAILS                                                             SCALE                                                                 APPROVED                                                                                                                               PROPOSED RESIDENTIAL DEVELOPMENT
                                                                                                      A     11.07.25     FOR APPROVAL                                                                  EC         CS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                Barlow Shelley Pty Ltd
                                                                                                                                                                                                                                                                                                                                                                                                                                                                ABN 29 679 702 599
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   AT 33A PAVILION STREET POMONA                                                                                                  2499
                                                                                                                                                                                                                         DATUM                     AHD

                                                                                                                                                                                                                         DESIGN                     EC
                                                                                                                                                                                                                                                                                                                                                                         .................                                                                      07 5443 8285                                       FOR PSP DEVELOPMENTS PTY LTD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                PO Box 899
                                                                                                                                                                                                                         DRAWN                      EC
                                                                                                                                                                                                                                                                                             NOT TO SCALE                                                                 Engineer: TIM BURKE                                                                   Maroochydore 4558                                  DRAWING TITLE:                                                                                                       DRAWING NUMBER           REV
                                                                                                                                                                                                                                                                                                                                                                                                                                                                [email protected]
                                                                                                                                                                                                                         DESIGN CHECK              CS
                                                                                                                                                                                                                                                                                                                                                                             (RPEQ 25245)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                barlowshelley.com.au
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   EROSION & SEDIMENT CONTROL DETAILS                                                                                       C510                 A
                                                                                                                                                                                                                                                                                                                                                                      DRAWING STATUS
                                                                                                                                                                                                                         DATE                  18-06-2025       This drawing is not to be copied or amended without written permission from Barlow Shelley Pty Ltd
                                                                                                                                                                                                                                                                                                                                                                           FOR APPROVAL
Log in to download the original file

2499 - 33 Pavilion St, Pomona - Revised Civil Drawings_Optimized.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.