Original source · versioned page text
2499 - 33 Pavilion St, Pomona - Revised Civil Drawings_Optimized
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
4 2
>
CUT OFF DRAIN F2 TO EXTENT TO SP179876 RP864877 LEGEND
VEGETATION COVENANT AREA 4
>
RP864877 LIMIT OF WORKS BOUNDARY
CUT OFF DRAIN F2
>
IL87.18 PROPOSED LOT BOUNDARIES
> CUT OFF DRAIN F1
PROPOSED LOT BOUNDARIES
1 IN 2 R
/ / / / / / / /
BATT
/
> > / /
> > / > / > / /
> / > / > / / > / /
> / > / > / > / / > / > / > / > / / > / > / > / >/ / > / > /
IL88.68 EXISTING LAND PARCELS
RP35073
>
/
.00 85.50
E
88.00 EXISTING EASEMENT
85 87.70
>/
5 88.05
82. 1 IN 4 1
82.5
EXISTING BATTERS
> /
>
86.00 7 BATTER
83.0
RP154922
1 IN 3 BATTER 87.00 W W W EXISTING WATER SERVICE
> /
100mm DEEP
88.00
CUT OFF DRAIN E
>
COMPENSATORY CUT S S S S S EXISTING SEWER SERVICE
84.5
/
87.50 87.90 IL88.88
3 OH OH EXISTING ELECTRICAL OVERHEAD
>
/
DEWATER AND MUCK OUT EXISTING 87.85
/
87.50 RP809059 SW SW SW EXISTING STORMWATER
DAM. REMOVE ALL UNSUITABLE TW 88.10
86.0
>
88.00
/
/
MATERIAL AND PREPARE A FIRM BW 88.10
88.0
H 0.00
> > > > EXISTING SWALE
/
TW 93.20
82.5
SUBGRADE PRIOR TO PLACING FILL.
/
EXISTING 5m WIDE ACCESS BW 92.05 2 / / / / / / EXISTING FENCE
>
ALL WORKS TO BE CARRIED OUT 6 TW 89.70 TW 90.65
/
& SERVICES EASEMENT H 1.15
/
87.40 TW 91.85
.00 0 RP809059
0
UNDER LEVEL 1 SUPERVISION. BW 88.90 BW 90.65
87.6
BW 91.85
85 86.0 90
0
CUT OFF DRAIN B
>
H 0.80 H 0.00 .00
87.4
H 0.00 EXISTING CONTOUR (INTERVAL 0.50m)
/
87.20
1 IN 2 87.45 87.80 IL90.65 IL93.36
/
90.
>
93.40
/
87.10 89.70 00 DESIGN CONTOUR (INTERVAL 0.20m)
/ / / / / / / / / OH OH OH OH OH OH OH
BATTER > > > > / > / >
94.20 Emt A
PAVILION STREET
/
91.75 92.05 TW 93.85 RP809059 OH
>
>
BW 93.85 PROPOSED SLEEPER RETAINING WALL
/
87.00
> 91.00
87.80 H 0.00
>
A 87.40 IL90.50
86.00
OH
>
8
92.0
OH
>
PROPOSED EASEMENT
/
85.00
ROAD 1
TW 88.10
93.00
C110 BUILDING
84.00
TW 90.65
H 0.00
.60
.0 83.00
87.20
>
/
H 0.00 PROPOSED EARTHWORKS BATTERS
94.00
PLATFORM
>
87
4 5
.40
TW 89.25
88.0
/
>
87
BW 88.10 CUT OFF
>
94.0
1 IN 3 CUT OFF DRAIN A
>
PROPOSED BIO BASIN BATTERS
83
H 1.15 DRAIN D 91.95 BATTER
/
>
00 92.20 5
92.
>
>
87.05 87.35 87.80 90.00 FINISHED SURFACE LEVEL
/
84.0 IL93.95 RP809059
>
90.00
>
87.20 94.75 EXISTING SURFACE LEVEL
90.0
EXISTING 1.5m PROPOSED EARTHWORKS CUT
>
3 IL90.64
88.00
>
WIDE EASEMENT
88.0
IL90.66
89.00
>
PROPOSED EARTHWORKS FILL
90.00
TREE STREET
>
87.20 87.70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.