Original source · versioned page text
2499 - 33 Pavilion St, Pomona - Revised Civil Drawings_Optimized
Original PDF page 3, section 3. The text section number identifies this passage in the reader.
S
S
//
324164 OH CUT AND FILL SHADING REPRESENTS EARTHWORKS
p:\2499-33 pavillion st pomona\design\civil\acad [opw]\c100 bulk earthworks plan.dwg
SP
>
/
//
BETWEEN NATURAL SURFACE AND FINISHED
S
S
/
OH SURFACE LEVELS
//
S
S
/
//
CAUTION - EXISTING SERVICES
THE CONTRACTOR IS TO DETERMINE THE EXACT
LOCATION OF ALL EXISTING SERVICES IN THE VICINITY
OF THE PROPOSED WORKS PRIOR TO THE START OF
ANY CONSTRUCTION. THE COST OF ANY
RECTIFICATION WORKS DUE TO DAMAGE OF EXISTING
SERVICES SHALL BE BORNE BY THE CONTRACTOR.
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DETAILS SCALE APPROVED PROPOSED RESIDENTIAL DEVELOPMENT
A 11.07.25 FOR APPROVAL EC CS
Barlow Shelley Pty Ltd
ABN 29 679 702 599
AT 33A PAVILION STREET POMONA 2499
DATUM AHD
B
C
18.07.25
29.08.25
FOR APPROVAL
RFI RESPONSE
EC
CS
CS
CS DESIGN EC 1:500 10 5 0 10 20 A1
................. 07 5443 8285 FOR PSP DEVELOPMENTS PTY LTD
PO Box 899
D 13.11.25 RFI RESPONSE CS CS Engineer: TIM BURKE Maroochydore 4558 DRAWING TITLE: DRAWING NUMBER REV
1:1000 A3
DRAWN EC [email protected]
DESIGN CHECK CS
(RPEQ 25245)
barlowshelley.com.au
BULK EARTHWORKS PLAN C100 D
DRAWING STATUS
DATE 18-06-2025 This drawing is not to be copied or amended without written permission from Barlow Shelley Pty Ltd
FOR APPROVAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.