Council archive · source document
12.2022 20220218 RFI response · MCU22/0172
6 December 2022
Ref: MCU22/0172, OPW22/0243, RAL22/0024
Ms L Pienaar
PO Box 141
Tewantin, QLD 4565
Attention: Lisa Pienaar
Dear Ms Pienaar,
Re: Information Request
At: 22 Grant St Noosa Heads Qld 4567
With reference to the abovementioned development application and the subsequent
further advice from Council, we have prepared a response to the engineering matters
raised as follows.
Engineering
Item 8d. Vertical vehicle clearance checks
Item 13. Vehicle swept path collision
The drawings have been amended to incorporate these additional details.
Item 11c. Connection to stormwater network
The invert level of the existing stormwater pit is 19.82m whilst the existing downstream pit
is 19.49m according to Council’s mapping system. Based on the distance between these
pits of around 43m, the grade between these assets is 0.75%. The proposal is to maintain
this grade from the new stormwater pit downstream of the driveway.
The drawings have been amended to incorporate these additional details.
We believe that the above satisfactorily addresses the engineering matters raised in the
information request however, should additional information be required, please contact
our office directly.
Yours faithfully,
RECOR Pty Ltd
Prepared by
Jaro Bauleka
Civil Engineer
CPEng RPEQ: 20693
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
12.2022 20220218 RFI response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 634 KB (small file)
- File type
No other editions are linked here.