Decision Notice - Change to an Existing Approval - 010.2004.00005743.003 [As Published] · 132004.5743.03

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                                                       2004/5743

52.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
Environmental Health
53.   A Waste Management Plan shall be submitted prior to demolition, removal or relocation of the
      existing building on- site.
      A Waste Management Plan is also required for construction of any building that requires
      development approval.
      Waste Management Plans are required to be submitted in accordance with Planning Scheme
      Policy 11, see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Waste
      Management Code)
      The Plan shall contain the following information:
             The site area for the storage and separation of waste is to be shown on the plan
              drawings accompanying the application.
             A waste management table as indicated below is to be completed showing how waste
              material is to be segregated - recycled – reused or disposed.


          MATERIALS ON-SITE               DESTINATION
                                          Re-use and Recycling              Disposal
          Expected    waste    Estimate   On-site            Off-site             *specify
          materials            volume     *specify re-use or *specify             contractor        and
                               (m³)       recycling          contractor      and landfill site
                                          methods            end user
          Excavation
          material
          Green waste
          Bricks
          Concrete
          Timber-please
          specify
          Plasterboard
          Metals - please
          specify
          Asbestos      (see
          below)
          Other - please
          specify
      Note: If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.
                                                                                     Page 7 of 13

Used in these records

About this file

File size
76 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2004.00005743.003 [As Published].pdf · 76 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.