Decision Notice - Change to an Existing Approval - 010.2004.00005743.003 [As Published] · 132004.5743.03
2004/5743
52. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
53. A Waste Management Plan shall be submitted prior to demolition, removal or relocation of the
existing building on- site.
A Waste Management Plan is also required for construction of any building that requires
development approval.
Waste Management Plans are required to be submitted in accordance with Planning Scheme
Policy 11, see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and
waste materials. These shall be located so that they are convenient and safe to use. (Waste
Management Code)
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimate On-site Off-site *specify
materials volume *specify re-use or *specify contractor and
(m³) recycling contractor and landfill site
methods end user
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos (see
below)
Other - please
specify
Note: If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2004.00005743.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 76 KB (small file)
- File type
No other editions are linked here.