Council archive · source document
MCU14/0006 Delegated Report
DELEGATED REPORT PLANNING APPLICATION FOR DEVELOPMENT APPROVAL Application no: MCU14/0006 Author: Glen Conforti Project Director: Glen Conforti SUMMARY: APPLICATION DETAILS Applicant: Ms AD De Aragao-Lehmann, Mr S Lehmann Proposal: Development Permit for Material Change of Use of Premises - Multiple housing Type 2 - Duplex Properly Made Date: 05/02/2014 Information Request Date: 5/02/2014 Info Response Received Date: 24/03/2014 Date of Site Visit: February and April 2014 Decision Due Date: 22/05/20104 Number of Submissions: Not Applicable PROPERTY DETAILS Property Address: 4 Crank St SUNSHINE BEACH RP Description: Lot 430 RP 48112 Land Area: 520 Existing Use of Land: Vacant STATUTORY DETAILS Locality: Eastern Beaches Zone: Attached Housing Assessment Type: Code PROPOSAL: The application seeks approval for a Development Permit for a Material Change of Use for a 3 storey duplex. A duplex is a consistent use within the Attached Housing zone and is required to follow a Code Assessable application process. The proposal consists of 2 x 3 bedroom units, with Unit 1 located on levels 2 and 3 and Unit 2 located on the ground and basement levels. Unit 1 includes 2 bedrooms, bathrooms and sitting area on level 2 and 1 bedroom, bathroom, kitchen, dining and living areas and swimming pool on level 3. Level 3 also includes extensive balconies and access to a roof top terrace. Unit 2 includes 2 bedrooms, bathrooms, kitchen and associated living areas on the ground level and 1 bedroom and study within the basement. The basement also includes garaging for 2 vehicles, storage areas and stair and elevator access to all the upper levels. The external finishes include recycled timber for cladding, glass and masonry finishes with a zincalume roof. The roof, when viewed from the street, slopes from the north and south to an offset (from centre) box gutter. SITE DETAILS: Site Description Site & Locality Description Road Frontage The lot is a trapezoid shape with a 23m frontage to Crank street. Existing Significant Vegetation Two strangler figs exist, 1 on the road reserve and 1 within the building footprint. A few casuarinas and macaranga’s exist and are within the building footprint. A large eucalypt in poor health is located near the north west corner which is proposed to be removed. Topography: The land has approximately 4m of slope from the south west to the north east corners of the lot. The land has a short sharp slope (approx. height of 1.5m – 1.75m) from the front boundary to within 1m of the kerb. Surrounding Land Uses: The surrounding land uses are characterised by duplex dwellings and unit developments three storeys in height. STATUTORY ASSESSMENT: The application has been assessed against the following statutory instruments, including: the South East Queensland Regional Plan, any applicable state planning policies, the state planning regulatory provisions, any applicable temporary local planning instrument and The application has also been assessed against the planning scheme, including the following applicable codes: Eastern Beaches Locality Code Residential Uses Code Landscaping Code Engineering Works Codes The application has been found to generally comply with all applicable statutory instruments. The pertinent issues arising out of the assessment are discussed below. The Eastern Beaches Locality Code seeks to ensure that developments built form is consistent with structures on adjoining and near by land, does not dominate the streetscape, varies in line and plane, and incorporates a varying roof form. An assessment of the proposal against these provisions are summarised in the following table:- Criteria Planning Scheme Proposal Complies Population density 160/ha = 8.32 persons max 6.6 persons Plot Ratio 0.6:1 = 312m² max 0.59:1 = 309m² Site Cover 35% max 34 % Landscaped open space 198m² min 119m² min soft landscaping 211m² 201m² soft landscaping Building height in storeys 3 storeys max 3 storeys Building height in metres 12 metres max 11.7m Boundary setbacks Attached Housing Zone Frontage 6 metres min for 2 storeys 6m - 2 storeys 10 metres for 3rd storey 7m – 3rd storey X South Side Half the building height 1.5m – 5.35m 2m X North Side Half the building height 1.5m – 5.5m 2m 3rd storey = 5.5m X Rear 6 metres min for 2 storeys 2.5m – 7m X 8 metres for 3rd storey 4m – 8.5m X Length of wall 15 metres desirable max 15m Carparking 2 covered min 1 visitor space 2 covered 1 visitor space The above table demonstrates the proposal complies with the scheme provisions except for the setbacks and a minor non-compliance in storeys. These issues are discussed in detail below. Setbacks The Noosa Plan requires, within the Attached Housing zone, the front and rear setbacks to be 6m, side setbacks to be half the building height and for the 3rd storey to be setback 10m from the front boundary and 8m from the rear boundary. Given the small lot (520m²) and the trapezoid shape, applying these setbacks would result in an unreasonably small building envelope. The Noosa Plan seeks to ensure that setbacks maintain the visual and acoustic privacy of adjoining and nearby properties, allow for landscaping between uses, and to maintain the visual continuity and pattern of buildings and landscape elements within the street. Developments on the western side of Crank Street and the eastern side of Henderson Street (to the rear of the site) were constructed under superseded planning schemes where setbacks were not as restrictive as The Noosa Plan. These superseded planning scheme setbacks were 1.5m (to 4.5m height), 2m (4.5m -7.5m) and 2.5m (7.5m +). A review of the setbacks in the surrounding area was undertaken and a variety of setbacks exist, however, no setbacks in accordance with The Noosa Plan’s Attached Housing zone setback provisions. Side setbacks vary from 1.5m – 2.5m with zero to 0.25m for some garages (8 Crank Street and 16 Henderson Street) and rear setbacks range from 1.5m to 6m with the adjoining lot to the rear having a rear setback of 1.5m – 4.5m. The development within the street is characterised by large unit buildings with no additional setback for the 3rd storeys. The rear setback encroachment is not in one plane but is a “saw tooth” of 3 triangular areas consisting of balcony (including sun shading battens and screening device) and stairwell areas. These areas of encroachment will not create any adverse overshadowing or affect view lines of the adjoining neighbours and the recycled timber screening maintains privacy and reduces western solar penetration. There is adequate area within the setback (2.5m – 7m) for dense landscaping to be provided to screen these encroachments. The Code requires setbacks to maintain the visual continuity and pattern of buildings within the street. In this regard, the proposed setbacks are similar to and consistent with setbacks within Crank Street and the surrounding area and therefore comply with the provisions of the Code. Despite the setback encroachments, the proposal complies with other built form parameters such as Density, Gross Floor Area (GFA), Site Cover, and Building Height and, exceeds the landscaping open space provision. It is pertinent to note that developments in the surrounding area were subject to 40% site cover under the superseded planning schemes; whereas The Noosa Plan’s Site Cover provision is 35%, effectively reducing the footprint of developments. The proposal has a site cover of 34% and therefore a smaller footprint and less bulky when compared to surrounding developments. Roof Terrace The Eastern Beaches Locality Code requires that roof terraces do not create overlooking opportunities to the private open space of neighbouring properties. The proposed roof top terrace is located towards the front of the roof (and lot) and the floor level is 2.6m below the top of the roof mitigating any opportunity to overlook neighbouring private open space. CONSULTATION: Other Referrals The application was forwarded to Unitywater and the following internal council specialists: Development Engineer, Engineering and Environment Assessment Branch Ecology Specialist, Engineering and Environment Assessment Branch Their assessment forms part of this report. Public Notification The application was not required to be publicly notified. CONCLUSION: The proposal encroaches into the setback but is considered to meet the Specific Outcomes of the relevant Code, being consistent with setbacks in the surrounding area and the development can be adequately screened by landscaping. Therefore, the proposal generally complies with the requirements of the planning scheme and does not raise any significant issues that can not be addressed by reasonable and relevant conditions. The application is recommended for approval. RECOMMENDATION APPROVE WITH CONDITIONS Application No. MCU14/0006 for a Development Permit for Material Change of Use of Premises - Multiple housing Type 2 (Duplex) situated at 4 Crank St SUNSHINE BEACH as identified in the attached details recommended for the Decision Notice. Development Application Number MCU14/0006 1. APPLICATION DETAILS Application No: MCU14/0006 Street Address: 4 Crank St SUNSHINE BEACH QLD 4567 Real Property Description: Lot 430 RP 48112 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Material Change of Use of Premises - Multiple housing Type 2 (Duplex) 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 4 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS When conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height The maximum height of the development must not exceed 12 metres above the finished ground level and the natural ground surface. The finished ground level must not be generally less than the existing natural ground surface to ensure the basement meets the definition of a basement pursuant to The Noosa Plan except for the area between the vehicle access ramp and the stairs to level 1/Ground Floor where it may remain at the level indicated on the approved plan. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Roof Top Terrace The roof top terrace must remain unroofed and unenclosed. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with condition. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level or otherwise fully enclosed or screen such that they are not visible from the street frontages or adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvers, glass panelling or the like, expect where required to satisfy any privacy condition of this Decision Notice. Fencing and Walls Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary must either: not exceed a maximum height of 1.2m be of open construction The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Waste Management Refuse storage, removal and collection facilities must be provided in accordance with the following: provision of two 240L wheelie bins for each dwelling unit provision of separate bins for general and recyclable waste for each dwelling unit, with an equal number of each being provided collection by service vehicles from the kerbside provision of a hardstand impervious area within the private open space area of each unit for the permanent storage location of the bins, having minimum dimensions of 0.36 m2 (600mm x 600mm) per bin. Acoustic Amenity Any fixed plant and equipment that causes either tonal (Leq) sound (e.g. from basement car-park exhaust, air conditioning unit or pool filtration unit), or impulse (Lmax) sound, must be enclosed, shielded and/or positioned to ensure that sound pressure does not exceed the following levels for habitable rooms within dwellings: 40 dB(A) Leq for living and work areas OR 45 (if near noisy/major roads) 35 dB(A) Leq for sleeping areas OR 40 (if near noisy/major roads) 45 dB(A) Lmax for all areas OR 55 (if near noisy/major roads) Note: Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with Australian Standard AS1055.1 “Acoustics – Description and measurement of environmental noise – General procedures”. *(Refer to Advisory Note) Certification must be submitted to Council from a qualified person* which certifies that operational noise from any fixed plant and equipment complies with the requirements of this Decision Notice. *(Refer to Advisory Note) LANDSCAPING & ECOLOGY The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and Planning Scheme Policy PSP 3 – Landscaping Plants and Guidelines and must include in particular: A 0.5m wide (minimum width) garden bed along the southern boundary extending from the bin area to the stairwell entry and must include a variety of plantings with trees at a minimum spacing of 4m centres a minimum 1m wide densely landscaped garden bed along the southern boundary extending from the stairwell entry to the rear boundary and for the full length of the rear boundary. The garden must include plantings with a mature height of not less than 8m and a spacing of 4m centres provision of 1 street tree within the road reserve for every 10 metres of road frontage All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. Existing trees in the road reserve must be assessed by a qualified person* and retained and protected where possible. Where mature trees are proposed to be removed, reasonable grounds must be given by the qualified person*. Any proposed tree removal in the road reserve must be indicated on the landscape plan and submitted as part of the operational works application. *(Refer to Advisory Note) Trees to be retained must be protected from clearing or construction activities by: clearly marking vegetation to be retained with flagging tape installing protective fencing around the drip line of the vegetation restricting stockpiling, storage and vehicle parking to those areas which are already cleared using low impact construction techniques around vegetation. ENGINEERING External Works Crank Street must be upgraded for the length of its frontage to the subject site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: construction of a 1.5m wide concrete footpath across the full frontage of the site. The path must be: designed and constructed in accordance with Council’s standard drawings, and located adjacent to the existing kerb and channel. removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed Site Access and Driveway A sealed access driveway must be provided from Crank Street to all parking and maneuvering areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a driveway crossover in accordance with IPWEAQ standard drawing SEQ R-050 a driveway width of 4 metres maximum in the road reserve excavation within the road reserve must be kept to a minimum. The surface profile within the road reserve adjacent to the access driveway must be reshaped such that the need for retaining structures is minimized. Car Parking A minimum of 3 car parking spaces must be provided and marked on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: 1 visitor parking space within the total, which is clearly marked for that purpose and accessible at all times for visitor use crossfalls and gradients in accordance with Australian Standard AS/NZS2890.1:2004. All car parking areas and access driveways must be maintained exclusively for vehicle parking and maneuvering and kept in a tidy and safe condition at all times. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and include: A drainage system generally in accordance with drawing No.24056-C4 prepared by SCG Consulting Engineers the use of gravity stormwater drainage and not surcharge pits. Electricity and Telecommunication Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Earthworks and Retaining Walls All fill/cut and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Earthworks required on site must be carried out in accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Earthworks carried out on site must not affect the structural integrity of any of the existing fences and/or buildings and/or structures and/or lands that border the development site. Fences that are affected must be replaced prior to the Building Certifier issuing the Certificate of Classification. A Geotechnical Engineer or similar qualified expert must assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or lands, and make recommendations on the type of foundation system(s) best suited for the proposed development. The recommendations of this report must be incorporated into the design and construction of the proposed development. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. UNITYWATER Construction activities must not impede the access of Unitywater or Fire Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers). Separate 25mm PE water services must be installed to a common lot boundary with independent meters installed outside the boundary of the lot in accordance with Unitywater and SEQ Standard Drawings. Water meters must be located on alternative boundaries to electrical pillars. The existing 100mm diameter AC watermain within Crank Street must be lowered and replaced with DICL pipes for the full width of the driveway and a distance sufficiently long each side of the driveway to allow the new main to be connected to the existing watermain without the use of vertical bends. The replacement works must be completed prior to excavation commencing on the site or the placement of construction materials/site offices over or adjacent to the water main alignment. Buildings, basements and other structures (including retaining walls) must maintain a minimum clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber or sewer inspection opening. The level of the existing sewer manhole and sewerage inspection opening must be adjusted as necessary to suit the proposed finished surface levels. Work must be undertaken by Unitywater at the applicant’s cost. The basement floor level must be constructed at a height to enable sewer servicing by way of a gravity connection to the existing house connection point in accordance with Plumbing Code requirements. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature, and suitable approved varieties. Construction works undertaken in the vicinity of Unitywater water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. 5. REFERRAL AGENCIES Not Applicable. 6. APPROVED PLANS The following plans are Approved Plans for the development: Approved Plans Plan No. Rev. Plan Name Date 1/14 Roof Plan and Building Layout, prepared by Steffen Lehmann 25 Jan. 2014 2/14 Roof Plan Roof Terrace, prepared by Steffen Lehmann 25 Jan. 2014 3/14 Plan Level 3, prepared by Steffen Lehmann 25 Jan. 2014 4/14 Plan Level 2, prepared by Steffen Lehmann 25 Jan. 2014 5/14 REV Plan Level 1/Ground Floor, prepared by Steffen Lehmann 25 Jan. 2014 6/14 Plan Basement, prepared by Steffen Lehmann 25 Jan. 2014 9/14 Section A-A:Long Section, prepared by Steffen Lehmann 25 Jan. 2014 10/14 Section B-B: Short Section, prepared by Steffen Lehmann 25 Jan. 2014 11/14 Street Elevation (East), prepared by Steffen Lehmann 25 Jan. 2014 12/14 North Elevation, prepared by Steffen Lehmann 25 Jan. 2014 13/14 West Elevation (Garden), prepared by Steffen Lehmann 25 Jan. 2014 14/14 South Elevation, prepared by Steffen Lehmann 25 Jan. 2014 7. REFERENCED DOCUMENTS The following documents are referenced in the assessment manager conditions: Referenced Documents Document No. Rev. Document Name Date 24056 Stormwater Drainage, prepared by SCG Consulting Engineers March 2014 8. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: ENVIRONMENT Qualified Person For the purpose of certifying acoustic treatments for the development, a qualified person is considered to be either: Registered Professional Engineer of Queensland; an environmental consultant with a minimum of 3 years current experience in the field of acoustics. Noise The applicant is advised to ensure that during the detailed building design and construction phase, including the design, selection and installation of fixed plant and equipment, A/C units and refrigeration plant, mechanical exhausts, acoustic enclosures/plant rooms and the like, that the ongoing advice and design input of a qualified acoustic consultant is sought and implemented to ensure that the operation of such plant and equipment complies with statutory and planning noise limits. Mechanical plant and equipment must be provided with appropriate acoustic enclosures/screening and located away from adjacent noise sensitive premises. UNITYWATER Connection to Unitywater live water mains and the Unitywater live sewer system must be undertaken by Unitywater at the applicant’s cost. LANDSCAPE & ECOLOGY For the purpose of preparing an Arborist Report, a qualified person is considered to be a person with either: ISA certification; or a Diploma of Arboriculture in addition to a minimum of 3 years current experience in the field of arboriculture. ENGINEERING Building and Construction Industry (Portable Long Service Leave) Levy (“QLeave”) The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. INFRASTRUCTURE CHARGES This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009. GENERAL Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Operational Work (Landscaping, Stormwater, Access and Carparking) Development Permit for Building Work (All Building Works) 12. SELF ASSESSABLE CODES Not Applicable. 13. SUBMISSIONS Not Applicable. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 16. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices. REPORT COVER SHEET PLANNING ASSESSMENT BRANCH Application no: MCU14/0006 Author: Glen Conforti - Project Director: Denis Wallace TO BE COMPLETED BY PROJECT MANAGER / REPORT AUTHOR: Is referral required to the Councillor Delegated Sign Off Mailbox?: Yes Has a site inspection been undertaken? Yes Has Infrastructure Policy Branch been notified and a request for an Infrastructure Contributions calculation been made? Yes Material to give to the Project Director □ A copy of any previous edited version of the report □ Plans and documents recommended to become Approved Plans and Documents □ Location plan / aerial photographs at appropriate scales □ Copy of all specialist advice and/or memos (or alternatively tagged in the file) □ Site photos (where obtained) □ Copy of all referral agency responses (or alternatively summarised in the body of the report) □ Copies of all adjoining approvals and past approvals for the site as may be relevant PROJECT MANAGER PROJECT DIRECTOR Signature: Signature: Position: Planning Technical Officer Position: Senior Development Planner Date: 1 May 2014 Date: 1 May 2014 [word/footer1.xml] FM6417/2-28/09/2012 Page 17 of 17 [word/footer2.xml] FM6417/2-28/09/2012 [word/header1.xml] DELEGATED AUTHORITY REPORT [Attachment: image1.jpeg (image text)] am ee} NOOSA COUNCIL [Attachment: image3.png (image text)] [Rear boundary DUPLEX Di Lot 430, 4 Sunshine E Clients: Consultant: Drawings su Date: 25 Jar Finished Gre Drawing Nu MAX. 12, 0505 FOR PRivacy Rov TeRaace SUNKEN IN Pitted RooF +370 Denennsenteh O.9 m PARAPET - Sa 19S¢
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0006 Delegated ReportRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
- DOCX
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.