Original source · versioned page text
Draft Parks and Playgrounds Asset Management Plan
Plans and drawings: the text below has words only, no drawings.
Figure 3: Parks and playgrounds Operating Costs & Forecast Significant increase in operational and maintenance in 2021 was due to the large volume of activities required during the early stages of the COVID-19 Pandemic. 4.5 Asset Renewals The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver future renewals of parks and playgrounds and subsequently the service these assets provide to the Noosa Community. Parks and playgrounds asset renewals are condition based. Condition assessments provide staff the ability to develop capital renewal programs. The ongoing asset management maturity relies heavily on the continued development of the condition assessments and subsequent implementation of maintenance and renewal plans. Renewal expenditure is work which does not increase the parks and playgrounds design capacity but restores, rehabilitates, replaces or renews an existing asset to its original service capacity. Improved condition assessment data capture is currently being developed to include asset renewal considerations based on physical conditions and estimates of remaining useful life of assets to guide and improve renewal programs. Renewal plans are developed to maintain levels of service to ensure assets achieve their optimal useful life before they reach the asset condition range of 5. Staff continue to work through the various asset classes to develop renewal programs for the specific asset classes. As previously stated - In the absence of physical condition data, an age-based approach to identify when Council’s parks and playgrounds will reach their useful life has been developed to determine an overall renewal plan. Priority is required across all the assets classes that have not had physical condition assessments to develop a suite of renewal programs. The graph below depicts the past and planned renewals by capital program including the next 10 years. There are ongoing renewals across pathways across the span of the 10 years. It is expected Asset Management Plan: Parks and Playgrounds Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.