Draft Parks and Playgrounds Asset Management Plan
Plans and drawings: the text below has words only, no drawings.
Cumulative Total Maintenance, Renewal and Upgrade Costs
O&M Total (Annual) Renewal Total (Annual)
$90,000,000.00
Combined Total (Cumulative) Upgrade Total (Annual)
Linear (Combined Total (Cumulative))
$80,000,000.00
$70,000,000.00
$60,000,000.00
$50,000,000.00
$40,000,000.00
$30,000,000.00
$20,000,000.00
$10,000,000.00
$-
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Figure 6: Parks and playgrounds 10-Year forecasted expenditures
Development of ongoing maintenance activities will ensure that future asset failure will be minimised
with a “no-surprises” approach for future funding forecasts. This will be supported through the initial
development of condition monitoring to predict potential maintenance and renewal requirements. In
compiling the current forecasts the following general assumptions have been identified.
• Proposed Capital Renewal Program will be funded in accordance with the current Council
model adopted;
• Renewal works will be prioritised according to asset condition;
• The condition of the assets reflect what is reported within this document;
• Current maintenance funding levels will meet service level requirements;
• Renewals, maintenance and isolated failure replacement is generally ‘like for like’;
• Where a renewal must be provided to a higher standard, the difference in cost between a ‘like
for like’ renewal and the higher standard is to be treated as an asset upgrade.
• Depreciation is in accordance with Council Policy;
• There is no allowance for CPI as the continuing revaluation and condition inspection process
will make adjustments for current rates.
Asset Management Plan: Parks and Playgrounds Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.