Original source · versioned page text
Draft Parks and Playgrounds Asset Management Plan
Plans and drawings: the text below has words only, no drawings.
Asset Management Plan: Parks and Playgrounds Page 23 vos a Ee SERVICE LEVEL TARGET When the playground inspection is done a quick visual scan is also done of the immediate area to pick up any &pparent maintenance issues. Similarly where @ reactive maintenance request is received the same visual checks occur. Essentially this resufts in 8 higher level of inspection than captured in Council's systems. >yche inspections Developed Ps Inspectic 5 month lormal spect program (except for Noosaville Foreshore which ts inspected by the Roads Landscaping crew at same frequency 88 program for road landscaping activities). Note: The six monthly inspection is based on 8 checklist that covers landscaping, trees, turf and hard infrastructure items (other than Playgrounds which have a different nes feet Playgrounds — Priority locations Fortnightly Note: Exceptions that are not captured in the Asset Management system: e Pirate Park, Noosaville (Almost daily in peak periods of use) . Skate facility, Peregian Beach (Twice weekly) Playgrounds — comprehensive (detailed check/bolts removed/foundations checked etc.) WHS inspections: ~ Botanical Gardens ~ Tewantin Splash Park Scheduled work Generall as identified 0 inspections o nased on site conditic Special Precincts - Wedding groves (5 sites at Main Beach, Noosa Twice weekly (contract work) Coconut trees at Noosaville Twice yearly (not a documented Foreshore, Noosa Heads Main inspection regime) Beach & Noosa Waters (remove flowering sterns/fruit) Asset Management Plan: Parks and Playgrounds Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.