Log in to see the plans as drawn EROSION AND SEDIMENTATION MANAGEMENT PLAN ENVIRONMENTAL DIARY CONSTRUCTION MANAGEMENT PLAN
Sediment Control Weekly Visual Inspection or After Rainfall Event
Project:- Operational Works Performance
Indicators
Item Performance Indicator CONSTRUCTION MANAGEMENT PLAN DIARY
Principal:-
Contractor:- GE & LK GRAMS
Objective Comply with all statutory regulations and maintain erosion and sedimentation 1. Vegetation No disturbance of soil below retained vegetation due to construction Weekly Visual Inspection or After Rainfall Event
Location:- 53-57 RENE ST, NOOSAVILLE
controls throughout the duration of construction. Comply with the intent of the activities.
Job Ref. 03-1129OW Project:- Operational Works
sedimentation management plan shown on sheet 29 of the drawings prepared
No:- Principal:-
LINDSAY CONSULTING PTY
by Noel Covey & Associates, and other measures as deemed necessary to Date:- Regular Monitoring (Weekly) 2. Hours of Work No work conducted outside specified hours without satisfactory evidence
LINDSAY CONSULTING PTY LTD
control erosion and minimise sediment transport. of measures taken to suppress noise and other emissions / dust. Contractor:- GE & LK GRAMS
Approx Time:- am/pm Special Event Monitoring (briefly describe event) LTD
Location:- 53-57 RENE ST, NOOSAVILLE
Date Condition Corrective 3. Lighting No resident's complaints regarding construction security lighting. Job Ref. No:- 03-1129OW Council File Ref. No.
Management Strategy Site Foreman to identify direction of stormwater land flows and flows resulting Item Control Acceptable Action Corrective Action Taken
from construction, and provide sediment fences, rock filter dams, turf strips, Monitored Measure Required (Describe) Date:- Regular Monitoring (Weekly) RPEQ 4928
stormwater pit entry filters, and other measures as shown on the plan or as Installed ü û 4. Existing Roads No abutting public roads contain soil, gravel, clay or other such
materials originating from onsite construction activities. Approx Time:- am/pm Special Event Monitoring (briefly describe event) OFF. 2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
deemed necessary to prevent uncontrolled stormwater flows over unprotected
areas, and avoid sediment transport to waterways and stormwater pits. Sediment
Fences 5. Signage No observed or reported incidents due to inadequacy or absence of Date Control
Condition C orrective Action
Corrective Action Taken
THIS DRAWING REMAINS THE PROPERTY OF
signage or other control measures. Item Monitored
Measure Installed
Acceptable Required
(Describe) LINDSAY CONSULTING PTY LTD AND IS FOR
Tasks and Actions Erect sediment barriers required, and at other locations as deemed necessary by THE SOLE USE OF THE CLIENT. NO PART
ü
Rock
û
6. Waste Control No complaints from local residents and site is kept tidy at all time
Required visual inspection. Temporary rock filter dams are to be placed at all
concentrated stormwater flow outlet locations and maintained with fresh filter
Filter
Dams Retained Vegetation MAY BE USED IN PART OR WHOLE WITHOUT
screenings throughout the duration of construction. All earthworks areas to be 7. Waste Minimisation No occurrence of illegal dumping onsite and all materials where possible PRIOR EXPRESS WRITTEN CONSENT OF
topsoiled and seeded or hydromulched upon completion of profiling. All footpath
areas to be provided with a minimum 4m wide turf strip behind kerb and
Stormwater
have been appropriately recycled. Air Emissions
LINDSAY CONSULTING PTY LTD
Outlets
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
channel immediately after footpath area construction and topsoil profiling is
completed. Strategically place filters around all stormwater pits.
Noise
CLIENT AND PROJECT DESCRIPTION
Catchpit 9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
Areas
GE & LK GRAMS
Security Lighting
No works are carried out without implementation of the approved Traffic
PROPOSED SUBDIVISION
Performance Indicators Site Foreman to - 10. Traffic Management Vibrations
· check for erosion and sediment flows at base of all embankments Pavement Management Plan.
Areas
and other
53-57 RENE ST
11. Existing Infrastructure Existing Utilities, Roads & Drainage Infrastructure
exposed areas after rain; No unplanned damage to existing utilities and infrastructure.
· check that rock filter dams are working during rain periods; Bottom
· check that all sediment fences and other erosion control
mechanisms are
working during rain periods; and
of
Embankment 12. Non Conformances All non conformances have been reported and rectified
Construction Traffic & Parking
NOOSAVILLE
Humeceptors/ The site foreman is to monitor the performance of all construction activities and any departure from the Waste Minimisation & Recycling
· clean and maintain filter fabric covers to pits after rain periods. Gross Monitoring
Pollutant Construction Management Plan control measures is to be immediately rectified.
Traps Erosion & Sedimentation Control (Environmental Diary)
Monitoring Site Foreman to monitor performance of all sediment controls on a
regular weekly basis and after every rainfall event. Any damaged Detention Responsible The site foreman is to be responsible for all inspections and maintenance of the Construction Management
Basin
Other
sediment control item is to be rectified, and trapped silt removed and Person Plan.
deposited in an area not prone to erosion.
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for
DRAWING TITLE
CONSTRUCTION M'MENT PLAN
Item Monitored
Other sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
Responsible Person Site Foreman to be responsible for all inspections and maintenance of sediment causes site runoff) or other special event affecting the site or any watercourses traversing the site.
control measures. Any Special Comments:-
Signed:-
Reporting The Construction Management Plan Diary (in conjunction with the Environmental Diary) shall be completed
and delivered to the Superintendent for record and audit purposes with each progress claim for the
Any Special Comments:- STREET PARKING
Reporting Site Foreman is to complete the Environmental Diary for sediment control on a construction works.
weekly basis as a minimum, but also after every significant rainfall event or other
special event affecting the sediment control measures. The Environmental Diary
shall be completed and delivered to the Superintendent for record and audit The site foreman is to arrange all corrective actions, controls and rectification activities, and report on Signed:-
Corrective
purposes with each progress claim for the construction works.
Actions all measures taken in the Construction Management Plan Diary. SCALES
Corrective Actions The Site Foreman to arrange for installation of additional sediment
controls and/or improve maintenance controls and replacement of
screenings to filter dams as required, and report on measures taken in
the Environmental Diary.
CONSTRUCTION MANAGEMENT PLAN
Objective To comply with all statutory regulations and relevant policies, and minimise the impact on the Construction 11. Implement the erosion and sedimentation control measures and associated management plan contained
environment whilst carrying out construction activities in a safe and sustainable manner. Management in the approved plans.
Tasks and Actions
Required 12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to SURVEY DATUM
minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
stormwater system.
Management
Strategy
To minimise the environmental and amenity impact of construction activities through onsite proactive
approach to construction processes and consequences (cause and effect). Successful integration of
13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted
soil from leaving the site via vehicle tyres.
.
activities will achieve ecological sustainability which is recognised as a balance that integrates the 14. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
protection of ecological processes and natural systems, economic development, and maintenance of point.
cultural, economic, physical and social wellbeing of people in communities. 15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
or whenever inspection shows signs of soil / pavement construction material on an abutting road or
ASSOCIATED CONSULTANTS
at the nominated site entrance.
Construction The following schedule of management strategies, tasks and actions for construction works forms the
Management 16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
basis of sustainable management of site construction issues. Irrespective of whether or not an item is
Tasks and Actions not attracted to poorly disposed of materials. Any waste or materials that have
Required included in the following schedule however, the Contractor shall employ best practice measures to
been illegally dumped on site shall be removed.
achieve sustainable outcomes at all times.
17. The Contractor shall provide bins for staff and sub contractors at locations
Management Strategy / Action where food is consumed and shall ensure that such bins are used and emptied at
regular intervals.
1.Ensure that all staff and sub contractors working on the site are aware of potential environmental
18. All materials, be they construction materials or used containers, shall either be
impacts and required minimum environmental control measures and responsibilities before
recycled onsite or alternatively transported to a Council approved recycling station
commencement of any site works.
or disposal point.
2.Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise 19. Any distillate or other petroleum products or dangerous goods stored onsite are
minimised in accordance with the approved plans. to be in bunded areas, located well clear of any watercourse. Appropriate spill
3. No dust emissions shall extend beyond the boundary of the site. control kits for any chemicals or stored fuels shall also be provided onsite.
20. Best practice management techniques shall be employed to control erosion and
4. No odour emissions are detectable beyond the boundary of the site. minimise sediment transport onsite, including those details contained in the
5.Work, including plant and equipment maintenance and servicing, shall only be carried out between the approved plans and the Erosion and Sedimentation Management Plan.
hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by 21. The Contractor shall prepare and implement an approved Traffic Management
EXISTING neighbouring residents if any work activity with the potential to emit excessive noise is to be Plan for site construction activities. The Traffic Management Plan shall be
DRIVEWAY undertaken outside the above mentioned hours, and even with such consent, such activities are to be provided to the Council inspector and the Supervising Engineer at the prestart
PROPOSED meeting.
minimised.
DRIVEWAY
22. Comply with any conditions of Council's operational works approval applicable to
6.All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
the works.
that equipment does not create environmental harm or excessive noise.
23. All public complaints received by the Contractor must be recorded in writing,
7.Temporary security lighting for the site must be designed and located to ensure that its effects are including any investigations undertaken, conclusions reached and actions taken as
not obtrusive and direct light spill does not alter the amenity of adjacent properties. a result of same. This complaints record is to be made available to the
administering authority on request.
8.All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
protected and maintained at all times, with the cost of any damage to such infrastructure to be
24. All site personnel are to report any significant non-conformances to the site REVISION LIST
met by the Contractor.
manager as soon as practical and within 1 hour of the occurrence of, or A ORIGINAL ISSUE 11/02/22
observance of same.
9. Any areas of high risk / danger on the site are to be adequately signposted. 25. The contractor shall prepare an informative letter to be dropped to
10. Vibration beyond the site boundary from construction activities is to be minimised and where there is residents/businesses adjacent to the development. The letter is to advise contact
a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the details for communications for the site manager, working hours, projected timing
property owner shall be advised accordingly. of works and any other information the contractor sees relevant.
PARKIN
G LAYO
ON ST UT SH
REET OWING
CAR PA THE LO
RKING SS OF
OF TH PLACES TWO
E PROP AS A
OSED RESULT
DRIVEW
AY
Computer File
031159CP.DWG
DRAWING NUMBER SHEET REV.
03-1159-C2 2 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.