Negotiated Decision Notice - 010.2008.00000110.001 [As Published] · 132008.110
2008/110
6.5 The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
6.6 The Applicant is advised that burning off is an unacceptable method of disposal.
7. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
8. All balustrading is to be of open or transparent materials.
9. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
10. Deleted.
11. The development shall utilise a colour scheme of muted earth tones and shall include light
weight materials (i.e. colour bond roofing, weather boards) with the external finishes as shown
generally on elevation plan number 2.1A.
12. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
13. The setback from the road frontage of the site to the outermost projection of the third floor
balcony roof shall be increased to a minimum of 8.9 metres with no pergola permitted over the
third floor balcony.
14. The development shall not exceed a maximum building height of 3 storeys or 12 metres
measured from natural and finished ground levels.
15. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
16. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
17. The Development Permit for a material change of use of premises lapses if the use has not
happened by 18 November 2012, unless an application to extend the currency is approved by
Council.
Land Development
River Flooding
18. All habitable rooms proposed on site shall be constructed to comply with Council’s Minimum
Floor Height requirements as defined in Council’s Planning Scheme and on Council’s Scheme
Maps at the time of issue of the Building Permit.
In this regard and as an indication only – the “habitable rooms” associated with this
development should have a Minimum Floor Height of RL 2.5 (AHD). These levels however
are subject to change and verification shall be made to Council’s Land Development Section
prior to obtaining a Development Permit for Building Works.
3 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2008.00000110.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.