            NOTES:
            BRACING MATERIALS - THE SHED ERECTOR TO SUPPLY SPECIFIC BRACING.
                                                                                       GUIDE TO(REFER
                                                                                                  THE       INSTALLATION OF TEMPORARY BRACING
                                                                                                      TO INSTALLATION GUIDE MANUAL FOR THE TWO METHODS OF CONSTRUCTION)
            SUITABLE RIGID MEMBERS CAPABLE OF TENSION AND COMPRESSION OR OPPOSING CHAINS OR
            OPPOSING LOAD RATED RATCHET STRAPS TO BE USED. (RIGID BRACING AS SHOWN ON
            DIAGRAM) ROPE BRACING SUITABLE ONLY FOR SMALLER STRUCTURES IN IDEAL CONDITIONS.

            BRACING LOCATION - TEMPORARY BRACING TO BE ERECTED AS CLOSE
            TO 45 DEGREE ANGLE AND FIXED TO THE TOP OF THE COLUMN OR MULLION TO
            ACHIEVE THE OPTIMUM EFFECTIVENESS. IF THERE IS NOT ENOUGH SPACE FOR A
            45 DEGREE ANGLE, THEN 20 DEGREE ANGLE IS TO BE THE MINIMUM ANGLE
            ALLOWED (REFER TO DIAGRAM). RIGID TEMPORARY BRACING MEMBER TO BE BOLTED
            TO HEAVY ANGLE PEGS HAMMERED INTO THE GROUND OR TO A BRACKET, MASONRY
            ANCHORED TO THE SLAB.

            BRACING REMOVAL - TEMPORARY BRACING TO REMAIN IN PLACE UNTIL
            CLADDING IS FULLY INSTALLED WHERE POSSIBLE. IN NO CASE SHOULD TEMPORARY
            BRACING BE REMOVED UNTIL ALL PURLINS, GIRTS (AND PERMANENT CROSS BRACING
            WHERE USED) ARE FIXED.

            SITE SAFETY - DUE CONSIDERATION TO BE GIVEN TO SITE SAFETY IN REGARD
            TO LOCATIONS OF BRACING AND PEGS.

            GUIDE APPLICATION - TEMPORARY BRACING AS DESCRIBED IS A MINIMUM
            REQUIREMENT FOR AN AVERAGE, STANDARD SITE CONDITION. PROVIDE ADDITIONAL
            BRACING FOR MORE SEVERE AND/OR HIGH EXPOSURE SITE CONDITIONS.
            ADDITIONAL BRACING TO BE USED AS AND WHERE NECESSARY TO ENSURE THAT
            ENTIRE FRAME IS RIGID THROUGHOUT CONSTRUCTION.
            RESPONSIBILITY FOR ENSURING STABILITY OF STRUCTURE REMAINS WITH THE BUILDER.
                                                                                                                                                                                 1C   TILT UP METHOD DIAGRAM
                                                                                                                                                                                  1   TEMPORARY BRACING LOCATION
            TILT UP METHOD
            FOR STRUCTURES UNDER 9M SPAN, LESS THAN 3M HIGH AND LESS THAN 12M LONG
                                                                                                                                                    1   TILT UP METHOD DIAGRAM
            A. ASSEMBLE THE FIRST SIDEWALL FRAME (COMPLETE WITH WALL SHEETING, BRACING                                                              1
               AND GUTTER) ON THE GROUND AND LIFT ASSEMBLED SIDEWALL FRAME INTO POSITION.
               FIX OFF TEMPORARY SIDE BRACING TO EACH END (REFER TO DIAGRAM). FIX BASE CLEATS.
            B. ASSEMBLE THE SECOND SIDEWALL FRAME AS PER FIRST SIDEWALL FRAME.
               LIFT INTO POSITION. FIX OFF TEMPORARY WALL BRACING TO EACH END (REFER TO DIAGRAM)
                FIX BASE CLEATS.
            C. FIX GABLE END RAFTERS TO COLUMNS TO TIE WALLS. PROP APEX UNTIL ENDWALL MULLION
               AND APEX TEMPORARY BRACE ARE FIXED OFF. IF NO MULLION IS REQUIRED THEN PROP AND
               BRACE APEX UNTIL CLADDING IS COMPLETE.
            D. INSTALL REMAINING RAFTERS. AS EACH RAFTER PAIR IS INSTALLED, AT LEAST ONE PURLIN
               PER 3M OF RAFTER LENGTH IS TO BE INSTALLED TO SECURE RAFTERS.
            E. INSTALL REMAINING PURLINS
            F. INSTALL KNEE AND APEX BRACES IF AND WHERE APPLICABLE.
            G. REPEAT FOR LEANTO'S.

            FRAME FIRST METHOD
            FOR STRUCTURES OVER 9M SPAN, GREATER THAN 3M HIGH AND GREATER THAN 12M LONG

            A. ASSEMBLE PORTAL FRAMES ON THE GROUND (WITH KNEE AND APEX BRACES IF AND
               WHERE APPLICABLE). LIFT THE FIRST PORTAL FRAME ASSEMBLY INTO POSITION.
               FIX OFF TEMPORARY END BRACING (REFER TO DIAGRAM). FIX BASE CLEATS.
            B. PROP APEX UNTIL ENDWALL MULLION AND APEX TEMPORARY BRACE ARE FIXED OFF.
               IF NO MULLION IS REQUIRED THEN PROP AND BRACE APEX UNTIL CLADDING IS COMPLETE.
            C. THE SECOND PORTAL FRAME ASSEMBLY TO BE LIFTED INTO POSITION. FIX EAVE PURLINS
               AND AT LEAST ONE PURLIN PER 3M OF RAFTER TO SECURE FRAME ASSEMBLY.
               FIX BASE CLEATS. FIX TEMPORARY SIDEWALL BRACING.
            D. STAND REMAINING PORTAL FRAME ASSEMBLY AS PER STEP C, FIXING TEMPORARY SIDE WALL
                                                                                                                                                                                 2C   FRAME FIRST METHOD DIAGRAM
                BRACING TO EVERY SECOND BAY. BRACE OTHER END PORTAL FRAME AS PER FIRST PORTAL
                                                                                                                                                                                  1   TEMPORARY BRACING LOCATION
                FRAME.
            E. INSTALL REMAINING PURLINS AND GIRTS.
            F. REPEAT FOR LEANTO'S.                                                                                                             2   FRAME FIRST METHOD DIAGRAM
  NOT PART OF COUNCIL APPLICATION DOCUMENTATION                                                                                                 1

                                     STEEL BUILDING BY

                                     JUST SHEDS SUNSHINE COAST & GYMPIE
CSTS66660

              23/9/2025




                                                                    07 5445 8532
                                                                                                                                                          TEMP BRACING
                                     FOR
                               STR
                          TM




                                     AT
                                                             ENAYET KHAN
                                                                14-16 ACTION ST,
                                                                  NOOSAVILLE

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 2- Engineering.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.