Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 2 - Final Noosa Plan 2020 Parts 1-3
The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Part 2 State Planning Provisions
2.1 State Planning Policy
The Planning Minister is satisfied that the State Planning Policy (SPP) dated July 2017 is appropriately integrated in the Noosa Council's
planning scheme in the following ways:
Liveable communities and housing
Housing supply and diversity
Liveable communities
Economic growth
Agriculture Development and construction
Mining and extractive resources
Tourism
Environment and heritage
Biodiversity
Coastal environment
Natural hazards, risk and resilience in part
Cultural heritage
Water quality
Safety and resilience to hazards
Emissions and hazardous activities
Infrastructure
Energy and water supply
Infrastructure integration
Transport infrastructure
Strategic airports and aviation facilities
2.1.1 State interests in the state planning policy not integrated or partly integrated
State Planning Policy (July 2017):
Natural hazards, risk and resilience coastal hazards in part
Editor’s Note – Development in the erosion prone area, as shown on the SPP interactive mapping system, will be subject to assessment
against the assessment benchmarks – natural hazards, risk and resilience within the State Planning Policy.
2.1.2 State interests in the state planning policy not relevant to Noosa Shire Council
Strategic ports
Editor's Note—The State Planning Policy July 2017 was approved by the Planning Minister and commenced on 3 July, 2017. In accordance with
section 8(4)(a) of the Act, the SPP applies to the extent of any inconsistency.
Where the planning scheme does not reflect the latest version of the SPP, additional assessment benchmarks may apply.
2.2 Regional Plan
The Planning Minister has identified that the Noosa Council's planning scheme appropriately advances the South East Queensland
Regional Plan 2017 as it applies to the
planning scheme area, in the following ways:
Aspects of the regional plan appropriately integrated
Grow
Efficient land use
Focusing residential density
New communities
Housing diversity
Growing rural towns and villages
Prosper
NOOSA PLAN 2020 Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.