Council archive · source document
06/0128 - MCU (code assessable) duplex dwelling at 18 Henderson St, Sunshine Beach · 132006.128
<. henderson street (18), sunshine beach – Material CHange of Use of Premises - duplex dwelling – 06/0128 (hb) REPORT BY: Planning Officer – Hannah Blue FILE: 06/0128 APPLICANT: Attunga Constructions Pty Ltd OWNER: Graham Sydney Wall SITE: 18 Henderson Street, Sunshine Beach described as Lot 1 on SP 171057, Parish of Weyba EXISTING USE: Multiple Dwelling AREA: 531 m² STRATEGIC PLAN: Preferred Dominant Land Use: Semi – Detached & Attached Residential ZONE: Residential Medium Density PROPOSED DEVELOPMENT: Duplex Dwelling DEVELOPMENT APPROVAL SOUGHT: Development Permit Preliminary Approval Material Change of Use X Building Works Reconfigure a Lot Operational Works Plumbing & Drainage Works REFERRAL AGENCIES: Nil RECEIVED: 24 January 2006 INFO REQUEST: Sent: N/A Received: N/A FEES PAID: $1537.00 ( Submissions Introduction On 29 July 2004 the applicant sought a Material Change of Use of Premises for a Duplex Dwelling at 18 Henderson Street, Sunshine Beach, comprising a 3-storey building containing 2 x 3 bedroom units. On 7 April 2005 Council approved the application and granted a Preliminary Approval subject to conditions. The approval required the applicant to submit a further Code Assessable application for a Development Permit for a Material Change of Use of Premises for a Duplex Dwelling, which is to be assessed against the conditions of the preliminary approval. This application represents that request. Assessment Condition 44 of the Preliminary Approval states:- 44. A Geotechnical Report shall be submitted and prepared by a Geotechnical Engineer or similar qualified expert. The report shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures, and make recommendations on the type of foundation system(s) best suited for the proposed development. This information shall be submitted as part of any future application for a Code Assessable Development Permit for a Material Change of Use for a Duplex Dwelling. As part of the current application, the applicant submitted a Geotechnical Report prepared by Soil Surveys Engineering Pty Ltd dated December 2005. Council’s Building Services have reviewed the report and raise no objections to the proposal subject to conditions. Conclusion The proposal raises no significant building concerns and is recommended for approval subject to conditions. RECOMMENDATION With regard to 06/0128 (Attunga Constructions Pty Ltd) for a Material Change of Use of Premises for a Duplex Dwelling at 18 Henderson Street, Sunshine Beach described as Lot 1 on SP 171057, Parish of Weyba, Council approve the application and grant a Development Permit, subject to the following conditions:- Land Use Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered 05/1938/S1E and 05/1938/S1F dated 1/11/2005 prepared by Adrian Pooley and Associates and as may be amended by these conditions. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The development must not exceed 40% maximum site cover, as defined by the Schedule to the Planning Scheme. The development is to provide a minimum 264m2 of landscaped open space, as defined by the Schedule to the Planning Scheme. The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter and to include the following:- Screen landscaping is to be implemented along the northern boundary, specifically to the area where the garage wall is setback 1 metre from the northern boundary. The landscaping shall include understorey plantings and a diverse range of trees ranging from 45 to 75 Litres and whereby an average height of 3 metres is achieved. All retained trees are to be protected from filling works and barricaded to prevent damage occurring during construction. Existing vegetation within the road reserve located north of the proposed driveway crossover is to be retained and enhance with locally occurring native species. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscape plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the fencing to be setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing. Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. Balustrading is to be of open and transparent materials. Any rooftop terrace is to be constructed in accordance with the provisions contained in section 5.4.1.8 of the Schedule to the Planning Scheme. Any balustrading associated with the rooftop terrace is to be setback a minimum of 1 metre from the edge of the rooftop. The garage opening to the parking accommodation is to remain unenclosed to enable the visitor space detailed on plan number 5/1938/S1C to be accessible at all times. The development must not exceed a building height of three (3) storeys and twelve (12) metres measured vertically at any point from both the natural ground level and the finished ground level, in accordance with the requirements of the Schedule to the Planning Scheme. The third storey of the development is to be set back a minimum of 9.1 metres from the road front boundary. The western elevation is also to include all windows as detailed on Drawing 05/1938/P1. The sliding windows located on the western elevation of levels 2 and 3 are to incorporate slatted timber privacy screens. The building façade of the lower level is to be painted a darker shade than the upper storeys. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2). All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this requirement. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. This Development Permit for a Material Change of Use of Premises lapses if the use has not happened by 31 March 2010, unless an application to extend the currency is approved by Council. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works. Building Services A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the minimum required floor level and the maximum building height above both natural and finished ground level required by the provisions of the Planning Scheme. Side fences/walls shall not exceed 2.0 metres above natural ground level. Fencing to the swimming pool must comply with the Queensland Building Act 1975, Part 3 (as amended) and Part 5 of the Standard Building Regulation 1993 in all respects. Direct access from the dwelling to the pool enclosure is not permitted. The Geotechnical report submitted as part of your application has been appraised and approved subject to the following conditions:- There is to be no uncontrolled discharge of water onto the slope; Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it should be reinstated immediately after construction is completed; Additional load due to fill, construction equipment or stockpiled materials should not be located on the dune slope; The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating, earthmoving or demolition machinery or other similar construction techniques; A condition survey is to be carried out of adjoining buildings, structures and services prior to any demolition works or construction works taking place on site. If distress already exists, a photographic survey shall be undertaken, the distress measured and a plan to monitor changes to distress shall be implemented; Boundary wall movement shall be monitored throughout construction by a RPEQ and if movement occurs construction is to be stopped immediately and appropriate action is to be taken to arrest the movement. Further work shall only take place after a re-assessment of the conditions on site; A RPEQ is to be engaged by the client to oversee the piling works. The applicant’s Geotechnical engineer will be required to oversee construction, to assess materials encountered, and inspect foundations to confirm design assumptions. If there is a risk of sand movement occurring, all work shall be suspended until such steps, approved by the applicant’s Geotechnical engineer, have been taken to ensure that no further slippage will result. Piles are to be designed to resist lateral forces resulting from instability. Land Development Vehicle Access A vehicular access driveway to serve the duplex shall be constructed from Henderson Street frontage of the site with a maximum width of 4.5 metres. The applicant shall design the driveway to AS2890.1-2004 and Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any level difference. The applicant shall provide details demonstrating that a design complying with AS2890.1-2004 can be achieved. This design detail must be submitted with any future application for a Development Permit for Operational Works. Should any driveways be constructed to grades that do not comply with AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do comply. Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall. All vehicles shall enter and leave the site in a forward direction. Carparking Off Street Carparking shall be provided within the site as shown on drawing number 5/1938/S1D dated 23/09/2005 prepared by Adrian Pooley, except as modified herein. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. All carparking shall be kept, maintained and line-marked in a condition fit for use. Vegetation Protection Vehicular pavements within the drip zone of any of the existing trees on site to be retained shall be designed as a pervious pavement (such as grass paving cells or similar), as this will allow water that falls on this surface to penetrate to the trees root system. The pavement shall be constructed so as not to damage the tree or their root system and in this regard temporary fencing shall be provided around the trees during construction to help protect them. Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works. Frontage Works Footpath improvements such as topsoiling, grassing, and tree planting are required to the Henderson Street frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. A new 1.2 metre wide concrete path shall be constructed along the Henderson Street frontage of the site in accordance with Council’s design standards and to an alignment that protects any significant vegetation or any underground services. Stormwater Drainage All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s: kerb & channel street drainage system in Henderson Street. Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works. The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage system at any one location is 25 litres/second. All site stormwater drainage shall be by means of a gravity system. Sewer Mains The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. Town Water Supply The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed. All fees for the supply of water meters shall be paid to the Council. Earthworks Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering Design Standards Manual and so as not to cause the ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural surface levels and contours of the adjoining properties must be provided with the application for a Development Permit for Operational Works for Filling and Drainage. This may require the design and construction of drainage pipes and/or an overland flow-path within the development site that caters for drainage from the adjoining sites for a design storm with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the drainage pipes or overland flow-path will also be required. In this regard a Development Permit for Operational Works shall be obtained. Should evidence be provided to Council indicating that No Ponding of stormwater will occur on the adjoining properties the requirement for the drainage pipes, overland flow-path and easement shall not apply. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to plan endorsement. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Environmental Health The developer must provide a suitably screened imperviously paved area large enough for all refuse and recycling containers. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner which prevents a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. Noise emission from air conditioning equipment shall comply with the following requirements: The equipment shall be installed and located in a manner which prevents noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences. Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at the nearest residential boundary. This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. A person must not use equipment on any day if it makes or causes noise to be made – Before 7am or after 10pm: More than the lower of either – 40 d(B)A 3 d(B)A above the background noise level From 7am to 7pm: More than the lower of either – 50 d(B)A 5 d(B)A above the background noise level From 7pm to 10pm: More than 3 d(B)A above the background noise level. Further Permits Required Prior to the commencement of development, the following Development Permits must be obtained Development Permit for building works. Development Permit for operational works of landscaping, car parking and access, frontage works, stormwater disposal, sediment and erosion controls and filling of the site. ADVICE FOR INFORMATION PURPOSES ONLY AND ARE NOT CONDITIONS OF APPROVAL. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that makes or causes audible noise to be made from the building work:- On a Sunday or public holiday, at any time; or On a Saturday or a business day, before 7.00am or after 6.30pm. A maximum penalty of $1,500 applies to an offence under this legislation. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, stormwater drain or a water course. On the spot fines apply for such offences. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as applicable). (Index: Customer – Martoo Consulting & Application - 06/0128 (PO7)) Directorates/Sections Consulted: Business Corporate Services Community Services X Environ & Planning Aquatic Centre Financial Services Art Gallery X Building Services Building Certific.Group Information Services Community Dev. Environmental Services Child Care Centre Legal Services Events Land Development Council Laboratory Planning & Support Environmental Health Land Use Leisure Centre Revenue Services Library Plumbing Services Water & Sewerage Public Order & Safety Strategic Planning Recreational Services Respite Centre Youth Works Human Resources Exec. & Secretariat Design Arts & Heritage Board Works Administration Economic Board Works Operations Environment Board Works Planning Social Board Tourism Board
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0128 - MCU (code assessable) duplex dwelling at 18 Henderson St, Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 268 KB (small file)
- File type
- DOC
No other editions are linked here.