Council archive · source document
08/0529 - Op Works - Road works & Stormwater [As Published] · 142008.529
Part-E;-Version-3:4,-3-March-2008-
INTEGRATED PLANNING ACT 1997
Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme
1. Nature of work that requires assessment against a planning scheme:
(] Building work - Complete Table A Operational work - Complete Table B
Table B
(i) Whatis the nature of the operational work?
BQ Roadworks Stormwater (_] Water infrastructure [J Sewerage infrastructure
[J Landscaping [] Earthworks ([} Drainage Works (1) Signage
{] Clearing vegetation under the planning scheme L] Other - Specify below
(ii) What type of approval is being sought? (OTE: if you have indicated multiple operational works in question (} above and your answers (0 this
question would be different for different operational work, i may be more appropriate {o provide these details in an attachment to this form)
{X] Development Permit L) Preliminary approval LJ Both (Specity below)
(ili) Is the operational work necessary to facilitate the creation of new lots {.e. subdivision)?
{}No [| Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
LIJNo (| Yes - Complete Table Bfa}
2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$70 BE ConlFiRIMED
3. Confirm that the following mandatory information accompanies this application
Confirmation. of g | sm cpemreerr errs
seb lodgement IE) wacsaeraae'
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fil) x] Confirmed
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
e — Part A must also be completed for ail IDAS development applications,
* The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur|
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0529 - Op Works - Road works & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.