Skip to the record
The gold standard in government transparency.

Council archive · source document

08/0529 - Op Works - Road works & Stormwater [As Published] · 142008.529

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Part-E;-Version-3:4,-3-March-2008-

INTEGRATED PLANNING ACT 1997

 
  

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

 
 

  

1. Nature of work that requires assessment against a planning scheme:

 

(] Building work - Complete Table A Operational work - Complete Table B
Table B
(i) Whatis the nature of the operational work?
BQ Roadworks Stormwater (_] Water infrastructure [J Sewerage infrastructure
[J Landscaping [] Earthworks ([} Drainage Works (1) Signage
{] Clearing vegetation under the planning scheme L] Other - Specify below

(ii) What type of approval is being sought? (OTE: if you have indicated multiple operational works in question (} above and your answers (0 this
question would be different for different operational work, i may be more appropriate {o provide these details in an attachment to this form)

{X] Development Permit L) Preliminary approval LJ Both (Specity below)
(ili) Is the operational work necessary to facilitate the creation of new lots {.e. subdivision)?
{}No [| Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

LIJNo (| Yes - Complete Table Bfa}

 

 

 

2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$70 BE ConlFiRIMED

 

 

 

 
   

3. Confirm that the following mandatory information accompanies this application

 

 

 

Confirmation. of g | sm cpemreerr errs
seb lodgement IE) wacsaeraae'
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fil) x] Confirmed

 

 

 

 

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
e — Part A must also be completed for ail IDAS development applications,
* The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur|

 

 

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0529 - Op Works - Road works & Stormwater [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.